OPERATING PROCEDURE
PHOTOS & ILLUSTRATIONS
13. Removing the heat exchanger
(1) Remove the air intake grille. (See Figure 1, 2)
(2) Remove the left and right side panels. (See Figure 3, 4)
(3) Remove the under panel. (See Photo 13)
(4) Remove the drain pan. (See Photo 14, 15, 16)
(5) Remove the pipe cover. (See Photo 17)
(6) Remove the pipe thermistors (TH2 and TH5) from each
holder. (See Photo 18)
(7) Remove the pipe band fixing screw and remove the
pipe band. (See Photo 21)
(8) Remove 3 screws from the heat exchanger and remove
the heat exchanger. (See Photo 22)
<Caution>
To avoid falling of the heat exchanger, be sure to hold
the heat exchanger by hand. For safety reasons, this
procedure must be performed by two persons.
Photo 21
Pipe band fixing
screw
Pipe band
Heat exchanger
fixing screws
Heat exchanger
Vane
Photo 22
Heat exchanger
C
Copyright 2012 MITSUBISHI ELECTRIC CORPORATION
Distributed in Mar. 2012 No.OCH501
Made in Japan
HEAD OFFICE : TOKYO BLDG., 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN
New publication, effective Mar. 2012
Specifications are subject to change without notice.
Содержание Mr.SLIM PCA Series
Страница 43: ...7 OCB501 ...