4 PROCEDURES BEFORE OPERATION
21
4
4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting a module
Mount the A/D converter module in any desired configuration.
2.
Wiring
Perform wiring of external devices to the A/D converter module.
3.
Adding a module
Add the A/D converter module to a module configuration by using the engineering tool. For details, refer to the following.
GX Works3 Operating Manual
4.
Parameter settings
Set up the parameters of the A/D converter module by using the engineering tool. For details, refer to the following.
MELSEC iQ-R Channel Isolated Analog-Digital Converter Module User's Manual (Application)
5.
Offset/gain setting
Perform the offset/gain setting to set a user range, if necessary.
6.
Programming
Create a program. For details, refer to the following.
Содержание Melsec iQ-R60AD16-G
Страница 1: ...MELSEC iQ R Channel Isolated Analog Digital Converter Module User s Manual Startup R60AD8 G R60AD16 G ...
Страница 2: ......
Страница 18: ...16 1 PART NAMES MEMO ...
Страница 24: ...22 4 PROCEDURES BEFORE OPERATION MEMO ...
Страница 26: ...24 5 SYSTEM CONFIGURATION MEMO ...
Страница 40: ...38 8 OFFSET GAIN SETTING 8 1 Setting Procedure 10 Click the Yes button ...
Страница 49: ...I 47 MEMO ...
Страница 55: ......