13. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
13.4 PLC Side Setting
13 - 41
9
ME
LSE
C
NE
T
/H
CONN
E
C
TION
(P
LC
T
O
P
L
C NE
T
W
ORK)
10
MELSE
C
N
E
T/10
C
O
NNECTION (P
LC
TO
PL
C
N
E
T
W
O
R
K
)
11
C
C
-L
ink
IE
CO
NT
RO
LLER
NE
TW
ORK
CON
N
E
CTI
O
N
12
CC-Link
IE FIELD
NETWO
RK
CONNE
CTION
13
C
C
-L
ink CO
NN
E
C
TI
ON
(INTEL
LI
GEN
T DEVI
CE
ST
AT
IO
N)
14
CC-Lin
k
CONNECTION
(V
ia G4)
15
IN
VER
TER
CONNE
C
T
ION
16
SE
R
V
O AM
P
L
IFI
E
R
CONN
E
C
T
ION
Settings of CC-Link module (A Series)
Set for each setting switch.
(1) Station number setting switch
: Necessary : As necessary : Not necessary
(2) Mode setting switch
: Necessary : As necessary : Not necessary
(3) Transmission speed setting switch
: Necessary : As necessary : Not necessary
*1
Specify the same transmission speed as that of the GOT.
(4) Condition setting switches
: Necessary : As necessary : Not necessary
*2
Will be valid when the CC-Link module is a local station.
In the case of the master station, turn off it.
POINT
POINT
POINT
When the switch setting has been changed
Turn the PLC CPU OFF then ON again, or reset the
PLC CPU.
Station
number
setting switch
Description
Set value
Setting
necessity at
GOT
connection
Station number setting
(master station)
0 (fixed)
Mode setting
switch
Description
Set value
Setting
necessity at
GOT
connection
Mode setting
(Online: Remote net
mode)
0 (fixed)
AJ61BT11
(2)
(4)
(1)
(3)
A1SJ61BT11
(2)
(4)
(1)
(3)
A
J61BT11
E
R
R
O
R
R
A
T
E
B
T
E
S
T
1
B RATE
0
156K
1
625K
2
2. 5M
3
5M
4
10M
ON
MODE
0 : ONLINE (A. R. )
2 : OFFLINE
RUN
ERR.
MST
S MST
LOCAL
CPU R / W
SW
M / S
PRM
TIME
LINE
L RUN
L ERR.
OFF
S MST
M / L
HOLD
CLEAR
3 / 4
1 / 2
SW
1
2
3
4
5
6
7
8
ON
10
8
6
4
2
9
7
5
3
1
NC
DA
NC
(FG)
SLD
NC
NC
NC
DB
DG
STATION NO.
10
x
x
156K
625K
2. 5M
5M
10M
TEST
S0
S1
S2
SD
RD
0
8
7
5
3
2
0
8
7
5
3
2
0
8
7
5
3
2
C
8
4
0
1 : ONLINE (RIM )
ISFM
SFM
2 / 3
1 / 4
10
8
6
4
2
9
7
5
3
1
NC
DA
NC
(FG)
SLD
NC
NC
NC
DB
DG
A1SJ61BT11
A
1SJ61BT11
1
234
567
8
O N
STATION NO.
MODE
10
x
1
x
B RATE
0 156K
1 625K
2 2. 5M
3 5M
4 10M
1
2
3
4
5
6
7
8
M / L
CLR
1/2
S. M
HLD
3/4
SW OFF
ON
RUN
ERR.
MST
S MST
LOCAL
CPU R / W
L RUN
L ERR.
SD
RD
SW
M / S
PRM
TIME
LINE
E
R
R
O
R
0
5
0
5
0
5
C
8
4
0
ISM SFM
1/4
2/3
10
x
1
x
0
1
9
8
7
6
5
4
3
2
0
1
9
8
7
6
5
4
3
2
STATION NO.
MODE
C
D
B
A
9
8
7
6
5
4
3 2 1 0 F E
Transmission
speed setting
switch
Description
Set value
Setting
necessity at
GOT
connection
Transmission speed
setting (156kbps)
*1
0
Condition setting
switches
Setting
switch
Description
Set value
Setting
necessity at
GOT
connection
SW1
Station type
(Master
station/Local
station)
OFF
(fixed)
SW2
Not used
OFF
(fixed)
SW3
SW4
Input data
status of the
data link
error station
(clear)
OFF
SW5
Number of
stations
occupied
*2
OFF
(fixed)
SW6
SW7
Not used
OFF
(fixed)
SW8
Module
mode
(Intelligent
mode)
OFF
(fixed)
B RATE
0 156K
1 625K
2 2. 5M
3 5M
4 10M
0
1
9
8
7
6
5
4
3
2
12
3456
78
O N
1
2
3
4
5
6
7
8
M / L
CLR
1/2
S. M
HLD
3/4
SW OFF
ON
ISM SFM
1/4
2/3
Содержание GT15
Страница 2: ......
Страница 34: ...A 32 ...
Страница 92: ......
Страница 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Страница 134: ...3 24 3 ACCESS RANGE FOR MONITORING 3 7 Connection to the Head Module of CC Link IE Field Network System ...
Страница 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Страница 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Страница 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Страница 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Страница 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Страница 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Страница 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Страница 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Страница 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Страница 510: ......
Страница 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Страница 668: ......
Страница 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Страница 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Страница 714: ......
Страница 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Страница 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Страница 762: ......
Страница 860: ...REVISIONS 4 ...
Страница 863: ......