6. DIRECT CONNECTION TO CPU
6.3 Connection Diagram
6 - 29
1
P
R
EP
ARA
T
OR
Y
P
R
OCEDURES
FOR
MONIT
O
R
ING
2
D
E
VICE RA
NGE
T
H
A
T
CAN
B
E
SET
3
ACCESS
RA
N
G
E
F
O
R MONIT
O
R
ING
4
HOW T
O
MONIT
O
R
REDUNT
ANT
SYS
TEM
5
BUS CONNECTION
6
DIR
E
CT
CONNECTION T
O
CPU
7
COMP
UT
E
R
L
INK
CONNE
C
T
ION
8
E
T
HE
RN
E
T
CONN
E
C
T
ION
Precautions when preparing a cable
(1) Cable length
The length of the RS-422 cable must be within the
maximum distance specifications.
(2) GOT side connector
For the GOT side connector, refer to the following.
1.4.1 GOT connector specifications
Connecting terminating resistors
(1) GOT side
When connecting a PLC to the GOT, a terminating
resistor must be connected to the GOT.
(a) For GT16, GT15, GT12
Set the terminating resistor setting switch of the
GOT main unit to "Disable".
(b) For GT14, GT11, GT10
Set the terminating resistor selector to "330 ".
For the procedure to set the terminating resistor,
refer to the following.
1.4.3 Terminating resistors of GOT
RS-422 connection diagram 5)
RS-422 connection diagram 6)
RS-422 connection diagram 7)
GOT side
(terminal block)
United wire color of
Q170MIOCBL1M-A
SDA
SDB
RDA
RDB
SG
RSA
RSB
CSA
CSB
Yellow(Dot mark:Black)
Yellow(Dot mark:Red)
Pink(Dot mark:Black)
Pink(Dot mark:Red)
White(Dot mark:Black)
White(Dot mark:Red)
GOT side
2
7
1
6
5
3
4
8
9
SDA
SDB
RDA
RDB
SG
PLC side
(terminal block)
GOT side
(terminal block)
PLC side
(terminal block)
SDA
SDB
RDA
RDB
SG
RDA
RDB
SDA
SDB
SG
RSA
CSA
RSB
CSB
RS-422 connection diagram 8)
*1
Set the terminating resistor of the PLC side to "330
Ω
"
RS-422 connection diagram 9)
*1
Set the terminating resistor of the PLC side to "330
Ω
".
RDA
RDB
SDA
SDB
RSA
RSB
CSA
CSB
SG
FG
2
7
1
6
3
8
4
9
5
-
SDA
SDB
RDA
RDB
RDR
SG
PLC side
*1
(terminal block)
GOT side
GOT side
(terminal block)
SDA
SDB
RDA
RDB
SG
RSA
RSB
CSA
CSB
RDA
RDB
SDA
SDB
SG
PLC side
*1
(terminal block)
Содержание GT15
Страница 2: ......
Страница 34: ...A 32 ...
Страница 92: ......
Страница 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Страница 134: ...3 24 3 ACCESS RANGE FOR MONITORING 3 7 Connection to the Head Module of CC Link IE Field Network System ...
Страница 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Страница 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Страница 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Страница 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Страница 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Страница 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Страница 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Страница 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Страница 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Страница 510: ......
Страница 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Страница 668: ......
Страница 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Страница 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Страница 714: ......
Страница 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Страница 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Страница 762: ......
Страница 860: ...REVISIONS 4 ...
Страница 863: ......