
91
7.9 Schedule Control
Schedule control is a control method that switches an ON/OFF contact output when the clock time of the control unit becomes
an arbitrary time by setting the ON and OFF time periods of contact output in the day in advance.
This schedule control requires the settings for two years, of which the ON and OFF time periods are set for each contact
output.
The maximum number of contact output varies depending on the number of control units in the system.
Output
Number of output
Maximum number of output
Contact output
The number of control units in the system × 3
96
Caution
<Precautions for control unit clock>
The control unit has a built-in clock.
The clock accuracy is five minute per month difference. Check the clock time regularly, and if there is a difference, adjust
the time. For details on how to check the present time, refer to
Содержание EMU4-CNT-MB
Страница 91: ...90 3 Click the Register button to save the settings ...
Страница 131: ...130 CC Link Communication Unit for Energy Measuring Unit EMU4 CM C ...
Страница 133: ...132 Small Type Display Unit for Energy Measuring Unit EMU4 D65 ...
Страница 134: ...133 15 External Dimensions of the Control Unit Note The unit of numbers mm Model EMU4 CNT MB Model EMU4 BT ...