6
2
4
6
8
1
2
3
4
5
6
7
8
9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
5
7
9
10.2
10
[Fig. 10.2.1]
[Fig. 10.2.3]
A
B
A
: Example of closure materials (field supply)
B
: Fill the gap at the site
No.
C
Shape
No.
C
Shape
PUHY-RP200YJM-B
PUHY-RP250YJM-B
PUHY-RP300YJM-B
PUHY-RP350YJM-B
[Fig. 10.2.2]
<A> Front pipe routing
4567
<C>
A
B
1
<C>
98
<C>
32
<C>
4567
<C>
23
<C>
A
B
<B> Bottom pipe routing
ODø22.2
IDø25.4
IDø9.52
ODø9.52
ODø19.05
IDø25.4
ODø28.58
IDø25.4
IDø12.7
ODø12.7
<A> Front pipe routing
<B> Bottom pipe routing
<C> Included with outdoor unit
A
Gas pipe (field supply required)
B
Liquid pipe (field supply required)
C
Shape
B
D
A
E
C
< A >
< B >
<A> Refrigerant service valve
(liquid side/brazed type)
<B> Refrigerant service valve
(gas side/brazed type)
A
: Shaft
B
: Service port
C
: Cap
D
: Pinched connecting pipe severing portion
E
: Pinched connecting pipe brazing portion
IDø25.4
ODø25.4
<gas side>
<gas side>
<gas side>
<liquid side>
<gas side>
<gas side>
<liquid side>
<liquid side>
<liquid side>
ODø15.88
IDø25.4
ODø12.7
IDø9.52
IDø12.7
ODø34.93
WT06215X01_illust_e.p65
10.12.17, 13:54
6