5 INSTALLATION AND WIRING
5.5 Wiring the IO-Link Cable
41
5
5.5
Wiring the IO-Link Cable
This section describes wiring of IO-Link cable.
Connecting the IO-Link cable
• Attach waterproof caps to connector not used.
• The product specifications are satisfied only when all of waterproof plugs are installed with the
recommended connectable devices and all screws are tightened with an appropriate torque. (
Recommended Connectable Device List)
1.
Power off the power supply of the IO-Link
module.
2.
Insert an IO-Link cable connector into the IO-
Link module. Pay attention to the connector's
direction.
3.
Tighten the waterproof plug of the IO-Link
cable using a torque wrench. (
4.
Power on the power supply of the IO-Link
module.
5.
Check that the CQ LED and Q LED of the
channel to which the IO-Link cable is
connected are in normal state. (
Содержание CC-Link IE Field NZ2GF12A-60IOLH8
Страница 1: ...CC Link IE Field Network Waterproof Remote IO Link Module User s Manual NZ2GF12A 60IOLH8 ...
Страница 2: ......
Страница 30: ...28 3 PROCEDURES BEFORE OPERATION MEMO ...
Страница 100: ...98 8 MODULE FUNCTION BLOCKS MEMO ...
Страница 109: ...9 PROGRAMMING 9 2 Program Example of Setting Parameters Using a Dedicated Instruction 107 9 ...
Страница 116: ...114 9 PROGRAMMING 9 3 Example of Program to Communicate with an IO Link Device ...
Страница 118: ...116 10 MAINTENANCE AND INSPECTION MEMO ...
Страница 155: ...APPX Appendix 7 Additional or Changed Functions 153 A MEMO ...
Страница 157: ...I 155 MEMO ...
Страница 161: ......