4 CONNECTIONS
4.5 Checking System Before Power-on
35
4
4.5
Checking System Before Power-on
This section describes the items to be checked before power-on.
1.
Check that the bridge module is mounted or connected correctly. (
2.
Check that the total length of the CC-Link is within the specified range. (
User's manual for the master module used)
3.
Check that the total length of the AnyWireASLINK system is within the specified range. (
4.
Check that the power supplied to the bridge module is within the specified range. (
5.
Check that the bridge module, slave module, terminating unit, and 24VDC external power supply are properly connected
and wired.
Содержание AnyWire NZ2AW1C2AL
Страница 1: ...CC Link AnyWireASLINK Bridge Module User s Manual NZ2AW1C2AL ...
Страница 2: ......
Страница 12: ...10 MEMO ...
Страница 119: ...APPX Appendix 6 External Dimensions 117 A Appendix 6 External Dimensions 43 86 10 102 3 5 3 4 0 3 Unit mm ...
Страница 121: ...I 119 MEMO ...
Страница 125: ......