11
5. INSTALLATION PROCEDURE
The installation procedure for the CC-Link communication unit is explained using
the GT1575.
5.1 CC-Link communication unit installation
(1) Power off the GOT.
(2) Remove two extension unit covers of the GOT.
(3) Attach the extend interface relay board to the extend I/F-2 side on the
GOT.
After the installation, detach the connector cover from the extend
interface relay board.
For the following GOT types, the extension interface relay board is not
needed.
•GT1655,155 of the GOT1000 series
•GT27,GT25 of the GOT2000 series
(4) Fit the CC-Link communication unit in the GOT case.
4)
3)
Remove the connector cover
Содержание 1D7M57
Страница 21: ...10 Extension interface relay board Unit mm inch 64 2 52 24 0 94 27 5 1 08 ...
Страница 27: ...16 MEMO ...