![Miteq RL1-095145 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/miteq/rl1-095145/rl1-095145_manual_1807872010.webp)
Installation | 4
SECTION 2: INSTALLATION
UNPACKING, STORAGE, RESHIPMENT
Carefully open the shipping container and remove the equipment. Inspect the equipment thoroughly and report any
damage.
If the equipment is to be stored, it should be wrapped in plastic and kept in a clean, dry place.
If the equipment is to be reshipped for any reason, wrap in heavy plastic and ship in a heavy (275 lb. test) double wall
carton. At least three inches of a solid packing material should be used on all sides of the unit. The carton should be
marked to indicate that it contains fragile electronic equipment.
MOUNTING
Slides are provided for mounting in a standard 19” equipment rack.
TURN-ON PROCEDURE
After mounting, make all external connections per Table 2-1. Refer to next subsection for proper system configuration.
Refer to Section 1 for the physical configuration of the 1:1 Redundant Line Amplifier System.
Apply power to the equipment using the power On/Off switches located on the rear panel of the unit..
All Power Supply and Unit Fault lights should be off.
System is now operational.
•
•
•
•
PROPER GROUNDING PRECAUTIONS
ARE REQUIRED AT ALL TIMES TO
PREVENT DAMAGE FROM ESD WHILE
HANDLING THIS UNIT
This equipment is NOT for use in a domestic
environment. It is intended for rack mounting.
This equipment MUST be securely mounted;
Operator injury may occur if this is not done.
!
CAUTION