Miracle LIB-136 Скачать руководство пользователя страница 1

 
 

 

D HANDRAIL 

Item  Description 

Qty 

Specifications 

D Handrail 

 

M10 Flat Washer 

Materials:   

M10x25mm Torx Bolt 

                   

 

 

 

 

 

 

 

Colour:  Optional 

 

 

 

 

 

 

 

Finish:  Powdercoat 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fasteners: 

 

 

 

Stainless Steel 

 

 

 

 

 

 

 

 

 

 

 

 

Application: 

 
Hand hold for deck entry or exit equipment. 
 
Available in 0.6M, 0.9M, 1.2M, 1.5M and 1.8M heights. 

            

Maintenance 

All fasteners should be regularly 
checked and retightened, if necessary, 1 
week after installation. 
Ongoing maintenance intervals will vary 
according to the amount of use the 
equipment receives. 
Recommend inspection intervals every 3 
months. 

* Wear Item - Refer Warranty

 

Installation Instructions: 

 

1.

 

Refer to drawings for location of D Handrail. 

2.

 

Position D Handrail and fix to upright with Torx 
Bolts with Flat washers under bolt head. 

3.

 

Ensure bolts are tightened prior to use. 

Note:

  

In-ground Upright depth may vary 
depending on Softfall 
-

 

Sand/Mulch/Grass–700mm (Pictured) 

-

 

Rubber – 500mm 

 
+ 300mm Added to Upright depth if      
component is Freestanding 
+ Use ID tag as reference.

 

 

Age Groups: 

 
 

 

 

 STRUCTURE: ____________________ 

DATE: ___________ 

 MIRACLE: ______________________ 

DATE: ___________                            

Doc No. A-39 

 

Содержание LIB-136

Страница 1: ...rding to the amount of use the equipment receives Recommend inspection intervals every 3 months Wear Item Refer Warranty Installation Instructions 1 Refer to drawings for location of D Handrail 2 Posi...

Страница 2: ...nd inspection intervals every 3 months Wear Item Refer Warranty Installation Instructions 1 Locate the Bridge on the layout plan 2 Fit the Handrails 1 to determine the position of the Posts and fit th...

Страница 3: ...rs should be regularly checked and retightened if necessary 1 week after installation Ongoing maintenance intervals will vary according to the amount of use the equipment receives Recommend inspection...

Страница 4: ...anty Installation Instructions 1 Slide 10 balls onto each of the slide bars sequence as below R Red B Blue Y Yellow RRR BBBB YYY YYY RRRR BBB BBB YYYY RRR RRR BBBB YYY 2 Using Torx Bolts Flat Washers...

Страница 5: ...ld be regularly checked and retightened if necessary 1 week after installation Ongoing maintenance intervals will vary according to the amount of use the equipment receives Recommend inspection interv...

Страница 6: ...aintenance All fasteners should be regularly checked and retightened if necessary 1 week after installation Ongoing maintenance intervals will vary according to the amount of use the equipment receive...

Страница 7: ...g to the amount of use the equipment receives Recommend inspection intervals every 3 months Wear Item Refer Warranty Installation Instructions 1 Refer to the plan view for the position of the panel 2...

Страница 8: ...Recommend inspection intervals every 3 months Wear Item Refer Warranty Installation Instructions 1 Refer to the plan view for position of Crawl Tunnel 2 Lift the Tunnel into position between the two...

Страница 9: ...See Warranty Installation Instructions 1 Locate the Upright on the plan drawing provided 2 Install Posts so that ID Tag sits at Finished Ground Level where indicated use this as master post to give me...

Отзывы: