
BENCH SEAT/ LANDING
Item Description
Qty
Specifications
Assembled Items
1
Aluminium Plank
1
Materials:
2
Frame
1
3
End Caps
2
Colour: Optional
Loose Items
4
M10x25mm Torx Bolt
4
Finish: Powdercoat
5
M10 Flat Washer
4
Tools: M10 Torx Key
Fasteners:
Stainless Steel
Application:
Landing – Foot platform for Overhead challengers and Motion
Rides.
Bench Seat – Role Playing
Maintenance
All fasteners should be regularly
checked and retightened, if necessary,
1 week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
* Wear Item - Refer Warranty
Installation Instructions:
1.
Refer to drawings for Bench Seat or Landing location.
2.
Lift Assembled Bench Seat/Landing (
1
) into to position and
attach to Nutserts in the Upright using M10x25mm Torx
Bolts (
4
) and Flat Washers (
5
) under the bolt heads.
(
Refer Detail A
)
3.
Ensure all bolts are fully tight.
Note:
In-ground Upright depth may vary
depending on Softfall
-
Sand/Mulch/Grass–700mm (Pictured)
-
Rubber – 500mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
STRUCTURE: ____________________
DATE: ___________
MIRACLE: ______________________
DATE: ___________
Doc No. A-37