MIOX RIO Zuni™ Operators Manual
P/N: 102-00094-I
Page 17
The 3/8” barbed oxidant outlet must be connected to an oxidant tank and a hydrogen vent
line. All barb fittings must be secured with the included hose clamps.
Only supply the RIO Zuni OSG brine (fully-saturated salt water) and fresh
water. Feeding other solutions instead of brine and water can cause severe
damage to the equipment or operator. Follow MIOX Salt Guidelines for salt
quality used in operating on-site generation equipment.
For direct injection applications, the RIO Zuni OSG can inject into a maximum
of 10PSI.
Electrical
The RIO Zuni requires only power and level switch connections for normal operation. The
included 10 foot power cord connects the system to 110-120 VAC and should be connected
to the standard IEC receptacle on the electrical back panel. For a 220-240 VAC connection,
replace the supplied power cord with a 10A rated 220VAC IEC Cable (220VAC cable not
provided by MIOX).
All RIO Zuni OSG systems ship with a pre-installed 2A or 4A fuse, depending on model. A
spare fuse is also included with the unit.
NOTE: Failure of the system that can be traced to a poor power source
is not covered under the MIOX warranty.
The level switches should be installed in the oxidant tank as described in the GA drawing
or Oxidant Tank Manual. The level switch cable is keyed so there is only one orientation
that matches the connectors on the back panel. Without level switches plugged in, the OSG
will never operate and instead will remain in ‘Standby’ mode.
All MIOX systems require a good earth ground. A neutral is not a substitute for
an earth ground. Electrical wiring to all MIOX units should be wired on a
separate circuit from other power devices, like pumps, etc. MIOX cannot be
held responsible for systems wired improperly that do not meet UL or National
Electrical Code (NEC) requirements. If the system is improperly grounded, the
MIOX warranty is void. If a local code requires a GFI (Ground Fault
Interrupter) circuit breaker, it is the responsibility of the customer to install
the GFI to meet local code requirements.
Safety
Safety
Содержание RIO Zuni 1
Страница 18: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 18 Figure 8 RIO Zuni Connections...
Страница 35: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 35...
Страница 36: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 36...
Страница 37: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 37...
Страница 38: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 38...
Страница 39: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 39...