4 Installation
4.1 Prior to mounting
4.1.1
Preparing the foundation/substructure
-
The foundation for the mounting kit must be horizontal (use spirit level), lat, and
rigid for the intended loads.
-
The load distribution on the available load cells must be as even as possible to
prevent overload of the individual load cells.
-
The substructure foundations/supporting surfaces for the mounting kits should be at
the same level, and the supporting surfaces of the weighing object (e.g. vessel feet)
must be arranged in parallel.
-
If soft iller layers (e.g. made from rubber or plastic material) are used between the
mounting kit and and/or between the mounting kit and substructure for vibration
dampening or for temperature insulation, a load compensating plate must be
provided between this soft iller layer and the mounting kit to ensure even load
application into the mounting kit.
The design of the insulation and compensation plates depends on the respective
application.
Note:
Installation may vary depending on the design, vessel size, and weight. It is possible to
screw or weld the mounting kit in place.
4.2 Tightening torques
The corresponding tightening torques are given in the following table.
Mounting kit
Mounting parts
Screws
Tightening torque
PR 92/00N
Load cell
M12-8.8
100 Nm
PR 92/00N
Lower plate
M12-8.8
75 Nm
4.3 Assembly
4.3.1
Safety instructions
WARNING
The vessel may turn over during mounting.
Securing the vessel against tipping is imperative.
Use an appropriate lifting jack.
Mounting kit with elastomer support PR 92/00N
4 Installation
EN-8
Minebea Intec