incoming lines coupled to the object at the level of the suspension point bear the
constraining work. The incoming lines must be horizontally rigid and vertically
lexible in this case.
-
The abutting face of the load end is marked with an arrow. The arrow indicates the
direction of the load, which must be exactly perpendicular and axial to the borehole.
Tilted or eccentric load applications and transverse loads lead to measuring errors.
3.2 Selecting maximum capacity
If there is a risk of the safe load limit E
lim
being exceeded (even only temporarily, e.g. by
falling loads), mechanical limiting in load direction is required.
-
Loads exceeding the safe load limit E
lim
of the load cell may change its characteristics
or damage the load cell.
-
Loads exceeding the destructive load E
d
of the load cell can led to its mechanical
destruction.
3 Recommendations for installation
Beam Type Load Cell PR 6207
Minebea Intec
EN-7
Содержание PR 6207
Страница 21: ...6 Connection Beam Type Load Cell PR 6207 Minebea Intec EN 19 ...
Страница 29: ......
Страница 30: ......
Страница 31: ...1 6 ...
Страница 32: ...2 6 ...
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......