
If you have any questions, please call MINCEY MARBLE CUSTOMER SERVICE at 1-800-533-1806.
Mincey Marble Mfg., Inc.
|
1940 New Harvest Road, Gainesville, GA 30507
|
800.533.1806
|
minceymarble.com
7
BRUNSWICK BYPASS DOOR ENCLOSURE SYSTEM INSTALLATION (cont.)
Slide Glass to Right to install
Left End Guide
Slide Glass to Left to install
Right End Guide
Slide Glass to Left to place
Center Guide
Slide Guide to Center under
Glass and install
After you have installed the Door Guides, you will need to adjust the Glass Doors for proper alignment. You can
adjust the doors Vertically by adjusting the SCREWS in the ROLLERS on each end of the doors. You make any
adjustments by carefully sliding out the ROLLER from the Glass Door Bracket just enough to access the screw.
You can raise the door by Tightening the Screw or Lower it by Loosening the Screw.
CAREFULLY SLIDE
OUT ROLLER
FROM GLASS
DOOR BRACKET,
ADJUST ROLLER
UP OR DOWN,
APPLY LOCTITE
BLUE 243 AND
RE-INSTALL
TIGHTEN TO RIGHT
TO RAISE, LOOSEN
TO LEFT TO LOWER
Proper alignment for the Shower Doors would be Flush to
the Bumpers in the Side Vertical Wall Channels, hanging
Level, above the Door Guides in the Bottom Rail without
any interference when operating back and forth.
The Inside Door should be closed to the wall where the
Shower Head Fixture is located. The Inside Door is where
the Towel Bar / Handle will be mounted inside the shower.
ACRYLIC WASHERS
INCLUDED:
4 - 1 1/8”
2 - 7/16”
INSIDE DOOR, INSIDE TOWEL BAR LOCATED
SAME WALL WITH SHOWER HEAD FIXTURE
Install the TOWEL BARS in the pre-cut holes in the
GLASS DOORS. Be sure to tighten the TOWEL BAR
ENDS with a
3
/
32
” ALLEN WRENCH - the hole used
for tightening is not a Set Screw, use the hole to
rotate the end until extremely tight.
Lastly, apply a bead of 100% SILICONE on the
INSIDE where the Curb meets the Pan and where
the Wall Channels meet the Panels. Repeat the
same process for the OUTSIDE of the Wall Channels
and the Bottom Rail.
Must allow the Silicone to
dry for 24 hours before any exposure to water
or moisture.
USE 3/32” ALLEN
WRENCH TO
TURN
THIS IS NOT A SET
SCREW, USE ALLEN
WRENCH TO ROTATE
TOWEL BAR END
UNTIL ADEQUATELY
TIGHT
THANK YOU FOR USING OUR MINCEY MARBLE PRODUCT! WE APPRECIATE YOUR BUSINESS!
RUN A BEAD OF 100% SILICONE
ON THE INSIDE AND OUTSIDE OF
THE VERTICAL WALL CHANNELS
AND BOTTOM RAIL, ALLOW 24
HOURS BEFORE EXPOSING TO
ANY MOISTURE
ADD LOCTITE BLUE
243 TO SCREW