Chapter 7 Operation, Adjustment, and Maintenance
7-3
7
2
3
4
5
6
Transport of media
Procedure
Transport of media
S
Mode
Key
Indication
Operation
Reference
1
media LOAD -
UNLOAD
Load the media roll to the air shaft.
2
Pass the media through two idle rollers.
3
P02 - No.3
Pressure roller
Lift the pressure roller.
4
Pass the media through the pressure roller.
5
Adhere the media to the conveyor belt.
6
P02 - No.3
Pressure roller
Lower the pressure roller.
7
Set the jog mode on the operator panel.
8
Control the operation of the belt.
9
Release the media from the belt and insert it into
the take-up unit.
10
P02 - No.1
[PNEUMATIC
BRAKE
ADJUSTMENT]
[ON] - [OFF]
If necessary, increase or decrease the tension of
the media with the pneumatic brake adjustment
lever.
11
Note
Only run at low speed during the feeding
operation.
End of procedure
Содержание ML Tiger-1800B MKII
Страница 3: ...ii 1 2 2 4 5 6 ...
Страница 6: ...v Troubleshooting 9 5 Dismantling 9 27 ...
Страница 25: ...Chapter 1 Introduction 1 19 1 2 3 4 5 6 M915601 PC outlet rated label ...
Страница 26: ...Chapter 1 Introduction 1 20 ...
Страница 38: ...2 12 Chapter 2 Outline explanation ...
Страница 50: ...4 10 Chapter 4 Installation ...
Страница 120: ...Chapter 6 Basic usage 6 66 ...
Страница 140: ...Chapter 7 Operation Adjustment and Maintenance 7 20 ...
Страница 174: ... MIMAKI ENGINEERING CO LTD 2020 IG MM Tiger Products Install Pack 2 04 ...