
W
ARRANTY
I
NITIATION
D
OCUMENTS
S
ERVING THE
M
ETAL
C
UTTING
I
NDUSTRY
S
INCE
1973
1400 M
ILL
L
ANE
•
W
ACONIA
•
MN 55387
T
EL
: 952.442.6455
•
F
AX
: 952.442.6457
www.milltronics.net
Chapter 9 Startup Checklist For ML/TL Series Lathes
(Mail to the above address to activate the machine warranty)
Company
Address
City
State
Zip
Contact
Phone
Fax
Model
Serial Number
Distributor
Phone
Salesman
Customer Responsibility
(See site preparation guidelines for details)
Remove
machine
from
skid
Checked
By
Place
machine
on
leveling
pads
Checked
By
Power ran to machine
Checked By
Air ran to machine for transmission, some models (80-120 psi 10 CFM) Checked By
Hydraulic (chuck option) oil supplied (17-18 Gal. DTE24, ISO VG32)
Checked By
Milltronics Representative Responsibility
(Initial or write n/a if does not apply)
1.
Check for missing parts
2.
Visually check for damage outside of machine and inside.
Mag Panel
Inside Mag Panel Check the Tightness Of All Connections
1.
Terminal block connectors
2.
Check all AMP plugs to ensure that the pins are all locked into the plugs
3.
All relays and contactors
4.
Transformer taps
5.
Main disconnect - both sides
6.
All AC distribution blocks
7.
Make sure that all plug in components are well seated
8.
Check all spindle and axis drive connectors
1
Содержание ML Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 20: ......
Страница 23: ...CHAPTER 2 SPECIFICATION ML14 26 Series Machine Layout 17 ...
Страница 24: ...ML35 40 Series Machine Layouts ML35 Series ML40 Series 18 ...
Страница 33: ...CHAPTER 3 SITE PREPARATION 27 ML22 ML26 Lifting device drawing ...
Страница 34: ......
Страница 74: ......
Страница 76: ......
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 83: ......