![Millipore Sigma Steritest Скачать руководство пользователя страница 108](http://html1.mh-extra.com/html/millipore-sigma/steritest/steritest_user-manual_1796939108.webp)
Page 108 of 113
•
Adjust the cover position to align the pump rotor with its housing, and then push on
the cover.
NOTE
The cover can be installed only when the equipment is switched off.
6.
Ensure that the cover is firmly seated on the pump.
NOTE
The gap between the pump and the protective cover is about 2 mm (.079
in.).
7.
Connect the communication hub to power source and switch it on using the
on/off switch (position l ).
8.
Press the
button to switch the pump on.
Reassembly is correct if the Autotest sequence initialization is successfully
passed.
9.
Install the bottle holder and the drain tray (see
Clamp rotation spindle
Clamp rotation spindle housing