
Page 1 of 2
Shower
Hose
Shower
Hose
Extension
Check Valve
1/2" BSP
Lugged Elbow
Water Feed
FINISHED WALL
Apply Sealant
Inlet
Fitting
15-20mm
Diverter Body
x2 Set
Screws
To Suit
Toggle
Wall
Anchor
Fixing Body
Shower Arm
Slide Rail
Noggin
Hand Shower
Shower Head
Twin Shower
Check Valve
PRE-
ASSEMBLED
Toggle
Anchor
Wall Fixing
Use 10mm Allen
Key To Fit
FIT OFF
- The Rail is supplied part preassembled to suit a Top Water
Inlet installation.
- FOR BOTTOM WATER INLET INSTALLATION SEE PAGE 2.
- Remove Inlet Fitting and Wall Fixing by loosening the Set
Screws.
- Accurately mark out and drill for the Wall Fixing 900mm from
centre of Water Feed (see Spring Toggle Wall Anchor guide).
- Ensure the wall penetration is sealed prior to connecting any
fittings.
- Apply thread tape or appropriate sealant to Water Feed
Thread and attach Inlet Fitting using 10mm Allen key.
- Using the provided Spring Toggle Anchor attach the Wall
Fixing.
- Fit the Rail Shower as assembled onto the Wall Fixing and Inlet
Fixing, secure by tightening the Set Screws.
- Remove the Diverter Body Cover Plate by loosening top Set
Screw.
- Align and fit the Shower Arm.
- Secure Shower Arm by tightening Set Screws.
- Attach Shower Head.
- Test function and water flow on both Shower Head and Hand
Shower.
- Check for water leaks.
Diverter Body
Coverplate
Set
Screws
x2 Set
Screws
22
54
1455
270
340
425
900
130
Shower
Hose
Shower
Hose
Extension
Check Valve
1/2" BSP
Lugged Elbow
Water Feed
FINISHED WALL
Apply Sealant
Inlet
Fitting
15-20mm
Diverter Body
x2 Set
Screws
To Suit
Toggle
Wall
Anchor
Fixing Body
Shower Arm
Slide Rail
Noggin
Hand Shower
Shower Head
Twin Shower
Check Valve
PRE-
ASSEMBLED
Toggle
Anchor
Wall Fixing
Use 10mm Allen
Key To Fit
FIT OFF
- The Rail is supplied part preassembled to suit a Top Water
Inlet installation.
- FOR BOTTOM WATER INLET INSTALLATION SEE PAGE 2.
- Remove Inlet Fitting and Wall Fixing by loosening the Set
Screws.
- Accurately mark out and drill for the Wall Fixing 900mm from
centre of Water Feed (see Spring Toggle Wall Anchor guide).
- Ensure the wall penetration is sealed prior to connecting any
fittings.
- Apply thread tape or appropriate sealant to Water Feed
Thread and attach Inlet Fitting using 10mm Allen key.
- Using the provided Spring Toggle Anchor attach the Wall
Fixing.
- Fit the Rail Shower as assembled onto the Wall Fixing and Inlet
Fixing, secure by tightening the Set Screws.
- Remove the Diverter Body Cover Plate by loosening top Set
Screw.
- Align and fit the Shower Arm.
- Secure Shower Arm by tightening Set Screws.
- Attach Shower Head.
- Test function and water flow on both Shower Head and Hand
Shower.
- Check for water leaks.
Diverter Body
Coverplate
Set
Screws
x2 Set
Screws
22
54
1455
270
340
425
900
130
Installation Instructions
Milli Pure Twin Rail Shower (top inlet)
INSTALLATION GUIDE
Tapware is to be installed by a Licenced Plumber in
accordance with AS/NZS 3500:2003
Recommended working water pressure 300-500kpa.
Maximum water temperature is 65 deg.C.
Plumbers, please ensure a copy of the Installation
Instructions are left with the end user for future reference
Fit Off
- The Rail is supplied part preassembled to suit a Top Water Inlet installation.
- FOR BOTTOM WATER INLET INSTALLATION SEE PAGE 2.
- Remove Inlet Fitting and Wall Fixing by loosening the Set Screws.
- Accurately mark out and drill for the Wall Fixing 900mm from centre of
Water Feed (see Spring Toggle Wall Anchor guide).
- Ensure the wall penetration is sealed prior to connecting any fittings.
- Apply thread tape or appropriate sealant to Water Feed Thread and attach
Inlet Fitting using 10mm Allen key.- Using the provided Spring Toggle
Anchor attach the Wall Fixing.
- Fit the Rail Shower as assembled onto the Wall Fixing and Inlet Fixing,
secure by tightening the Set Screws.
- Remove the Diverter Body Cover Plate by loosening top Set Screw.
- Align and fit the Shower Arm.
- Secure Shower Arm by tightening Set Screws.
- Attach Shower Head.
- Test function and water flow on both Shower Head and Hand Shower.
- Check for water leaks.