OM-261050 Page 23
SECTION 6
−
ENGINE PREPARATION
6-1. Connecting the Battery
265 802-A / 287 097-B
1/2 in.
Tools Needed:
!
Route battery cables
away from hot, sharp, or
moving parts.
!
Connect negative (
−
)
cable last.
1
Battery Cable Strain
Relief
2
Starter
3
Starter Cable Lug
(Supplied)
4
Engine Block
Route cables from vehicle bat-
tery through strain relief.
Crimp supplied starter cable
lug onto positive (+) cable.
Connect positive (+) cable to
engine starter.
Locate hole in engine block
behind unit center upright.
Connect negative (
−
) cable to
engine block.
Battery Specification:
12 V, 650 CCA at 0
°
F
Battery Cable Specification:
1/0 AWG
1
1
3
2
4
Содержание ENPAK
Страница 47: ...OM 261050 Page 43 10 2 Remote Panel Use With Section 10 3 248 998 1 2 6 3 4 5 7 8 9 10 11...
Страница 64: ...OM 261050 Page 60 SECTION 13 DIAGRAMS Figure 13 1 Training Circuit Diagram For EnPak...
Страница 65: ...OM 261050 Page 61 261 040 D...
Страница 66: ...OM 261050 Page 62 257 926 C Figure 13 2 EnPak Circuit Diagram...
Страница 67: ...OM 261050 Page 63 261 045 A Figure 13 3 Air Compressor Diagram...
Страница 69: ...OM 261050 Page 65 238 945 B1 Figure 13 6 Hydraulic Circuit Diagram Page 1 Models With Hydraulic Power Source...
Страница 79: ...OM 261050 Page 75 Notes...
Страница 94: ...OM 261050 Page 90 Notes...