OM-261050 Page 21
SECTION 5
−
INSTALLATION
!
Do not move or operate unit
where it could tip.
!
Always securely fasten unit
onto transport vehicle and
comply with all DOT and other
applicable codes.
Go to MillerWelds.com for more
information on truck installations.
NOTICE
−
Do not install unit where
air flow is restricted or engine may
overheat.
See Section 5-2 for mounting in-
formation. See Section 4-7 for di-
mensions.
See Section6 through 9 for spe-
cific EnPak systems information.
1
Hydraulic Reservoir
2
EnPak
Typical hydraulic reservoir place-
ment in relation to EnPak. See Sec-
tion 7-1 for complete reservoir re-
quirements.
Ref: install3 2014
−
12
−
805 454-A / 265 802-A
Movement
5-1. Installing Unit
OR
Location/Airflow Clearance
1 in.
(25 mm)
7 in. (178 mm) Maintenance
4 in. (102 mm) Operation
18 in.
(460 mm)
1 in.
(25 mm)
1
2
1
2
7 in. (178 mm) Maintenance
4 in. (102 mm) Operation
!
Hot air.
!
Hot air.
!
Hot air.
Содержание ENPAK
Страница 47: ...OM 261050 Page 43 10 2 Remote Panel Use With Section 10 3 248 998 1 2 6 3 4 5 7 8 9 10 11...
Страница 64: ...OM 261050 Page 60 SECTION 13 DIAGRAMS Figure 13 1 Training Circuit Diagram For EnPak...
Страница 65: ...OM 261050 Page 61 261 040 D...
Страница 66: ...OM 261050 Page 62 257 926 C Figure 13 2 EnPak Circuit Diagram...
Страница 67: ...OM 261050 Page 63 261 045 A Figure 13 3 Air Compressor Diagram...
Страница 69: ...OM 261050 Page 65 238 945 B1 Figure 13 6 Hydraulic Circuit Diagram Page 1 Models With Hydraulic Power Source...
Страница 79: ...OM 261050 Page 75 Notes...
Страница 94: ...OM 261050 Page 90 Notes...