Page 3-4
Chapter 3: Changing Heating Systems
|
Section 3.2: Changing from Hot Wedge to Hot Air
8.
Remove the Hot Wedge Heating System by
carefully sliding the entire assembly upward
until it is free.
(Figure3.21)
9.
Install the Hot Air Heating System by placing
the Heating System mounting Plate into the
slide and sliding the assembly down until the
mounting plate is against the Height
Adjustment Knob.
(Figure3.22)
10.
Connect the grey connectors into the sockets
on top of the machine and tighten screws
finger tight. Note that the plug will only fit
into it’s correct socket.
(Figure3.23)
(Figure3.24)
11.
Install the Green Air Line into the black air
fitting by pushing in on the white plug and
sliding the airline into place.
(Figure3.25)
12.
Connect the black Hot Air Supply Line by
pushing in disconnect tab and installing line.
(Figure3.26)
13.
Tighten the Front Locking Bolt.
(Figure3.27)
14.
Change the bottom Weld Roller to a Knurled
Steel Weld Roller and then the top if
applicable.
15.
For Proper Nozzle Alignment See:
Section
2.1.
Figure 3.21:
Figure 3.22:
Figure 3.23:
Figure 3.24:
Figure 3.25:
Figure 3.26:
Figure 3.27:
Содержание T-100
Страница 1: ......