Installation and connection
53
Installation
Levelling the dryer
Make sure the dryer door can be
opened without hindrance after in-
stallation.
The appliance must stand perfectly
level to ensure safe and proper opera-
tion.
The screw feet can be adjusted to com-
pensate for unevenness in the floor.
Ventilation
The cool air intake at the front of
the dryer must not be blocked or
covered. This would hinder a suffi-
cient intake of cool air for the heat
exchanger.
Do not block the gap between
the bottom of the tumble dryer and
the floor with plinth facings, deep
pile carpet etc. This would hinder a
sufficient flow of air to the dryer.
Air which is taken in to cool the heat ex-
changer is then blown back out of the
dryer and warms up the air in the room.
It is therefore very important to ensure
adequate ventilation, e.g. by opening a
window. Otherwise drying durations
may be longer (increased energy re-
quirement).
Before moving the tumble dryer
again (e.g. when moving house)
After each use a small quantity of con-
densed water will collect in the area of
the pump. This water can run out if the
tumble dryer is tipped up when it is be-
ing moved. Recommendation: run the
Warm air
programme for approximately
1 minute before moving the tumble
dryer. Any remaining condensed water
will then be fed into the condensed wa-
ter container or out through the drain
hose.