![Miele SmartLine CS 7101 Скачать руководство пользователя страница 49](http://html.mh-extra.com/html/miele/smartline-cs-7101/smartline-cs-7101_operating-and-installation-instructions_233894049.webp)
Installation
*INSTALLATION*
49
Installation – surface-mounted
Preparing the worktop
Create the worktop cut-out.
Remember to maintain the minimum
safety distances (see "Installation –
Safety distances").
Seal the cut surfaces of
wooden
worktops
with a suitable sealant to
avoid swelling caused by moisture.
The sealant must be heat-resistant.
Make sure the sealant does not
come into contact with the top
surface of the worktop.
Fitting the spacer bars
Use the middle screw holes if one of the
following SmartLine appliances is
installed to the right or left of the spacer
bar: CS 7611, CS 7641, CS 7101(-1),
CS 7102(-1)
Wooden worktops
Position the spacer bars flush onto
the upper edge of the cut-out.
Secure the spacer bars with the
3.5 x 25 mm wood screws supplied.
Granite and marble worktops
You will need heavy-duty double-
sided tape (not supplied) to secure the
spacer bars.
Stick the tape along the top edge of
the worktop cut-out.
Position the spacer bars flush onto
the upper edge of the cut-out.
Press the spacer bars firmly into
place.
Содержание SmartLine CS 7101
Страница 17: ...Overview 17 Wok burner a Burner b Pan support c Operating controls ...
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 72: ...M Nr 10 858 310 01 en AU NZ CS 7101 ...