Installation
*
I
N
S
T
A
L
L
A
T
I
O
N
*
60
Front view
a
Mains connection cable
b
Control panel
c
Door
d
Fluff filter flap for the filter in the
plinth
Do not open the flap during a running
programme. Open only when a
prompt appears in the display
Otherwise a technical fault may
occur.
e
4 height-adjustable screw feet
f
Intake for air cooling
g
On-site ducting (installed on the right
or left rear side)
Содержание PDR 908 EL
Страница 96: ...M Nr 11 226 810 02 en AU NZ PDR 908 EL ...