40 CropHawk Draper Platform Operators Manu-
Reel
Service / maintenance
Reel Removal and Installation
Removal
NOTE: Remove left (Idle) reel section first
1.
Position reel at fully forward position.
2.
Support left reel section at 2 points to allow removal (e.g.
Forklift or 2 [1000kg] lifting straps a suitable distance apart).
3.
Remove 4 twin reel alignment bolts (A).
4.
Remove fore-aft connecting bolt (B) and safety bolt (C) from
the end of the left side reel arm.
5.
Withdraw left reel section and support on suitable blocks
6.
Support right reel section at 2
points to allow removal (e.g.
Forklift or 2 [1000kg]lifting
straps a suitable distance
apart).
7.
Disconnect and cap reel drive
hydraulic lines (D) and reel
speed sensor. (D)
8.
Remove fore-aft (B) connect-
ing bolt and safety bolt (C)
from the end of the right side and centre reel arm.
9.
Withdraw right reel section and support on suitable blocks
IMPORTANT: Bearing housings are top heavy and can swing down on removal
Installation
NOTE: Install right (Drive) reel section first
1.
Installation is the reversal of steps 1 to 9 taking note to torque centre alignment bolts to 56nm (41ft-lb)
after aligning the reel and re-check after 1 hour of operation.
A
D
B
C