High Temperature Hydro Module
202003
15
Engineer
ing Da
ta
7
Unit Installation
To check the interior of the unit, open the top panel, front panel, and rear panel first. After you open these three panels,
you can see the main parts of the unit. If you just install or maintain the internal parts of the electric control box, you
need to open the front panel without needing to open the top or rear panel.
1 Top panel
2 Front panel
3 Rear panel
To open the electric control box and operate the interior of the electric control box, open the electric control box cover plate.
To open the electric control box, you can open the front panel without needing to open the top or rear panel
.
Caution
The unit should be installed by professional installation operators. Material selection and installation must confirm
with the local legal provisions.
Notes for installers and service engineers
Содержание SMK-D140HHN1-3
Страница 1: ...High Temperature Hydro Module SMK D140HHN1 3 Engineering Data Commercial Air Conditioners R410A...
Страница 2: ......
Страница 4: ...High Temperature Hydro Module 2 202003 Midea VR High Temperature Hydraulic Module...
Страница 8: ...High Temperature Hydro Module 6 202003 Midea VR High Temperature Hydraulic Module 5 BOM...