Midco Unipower V1 Скачать руководство пользователя страница 12

12

Midco International Inc.

8471 95

Part 1 Installation

WARNING: Ignition is automatic. Con

fi

 rm that gas utilization equipment does not    

 

 

contain any accumulated gases. Purge as described in step 3 below.

CAUTION: Cover plates, guards, and enclosures must be maintained in place at all    

 

 

times except during maintenance and service.

1.  Check the burner piping and valves for gas leaks by applying a weak liquid soap solution to 
unions and joints with the gas supply on. Leakage will be indicated by the appearance of soap 
bubbles. Locate and correct all gas leaks before proceeding.

WARNING: DO NOT USE OPEN FLAME.

2.  Purging the air from the gas supply line at this step will expedite 

fi

 rst light-o

 .

IMPORTANT

: Purge outside the building. Do not purge into the gas utilization equipment.

3.  To purge the gas utilization equipment and chimney of any accumulated gases, turn main 
Manual Gas Shut-o

  Valve to 

OFF

, close Pilot Manual Shut-O

  Valve, turn burner power 

ON

, and 

set operating control to 

ON

 to call for heat. Let the blower run long enough to accomplish four 

combustion chamber volume air changes, but for not less than two minutes.

CAUTION: Make sure that the capacity range of the burner is suitable for capacity 

 

 

rating of the gas utilization equipment. Refer to Speci

fi

 cation Section page 2

4. 

RESET

 the 120 volt

 RM7895 

fl

 ame safeguard by pushing its reset button. 

RESET

 the 

LME71

fl

 ame safeguard by holding down the info button for one second. See Section VIII.

5. Con

fi

 rm that both the Main and Pilot Manual Shut-O

  Valves are open. Turn main Manual Gas 

Shut-o

  Valve to 

ON

.

6.  Turn operating control to 

ON

. After the prepurge is complete, the pilot should ignite. Whenever 

the burner pilot fails to light during the ignition trial, or if the 

fl

 ame is lost during the burner run 

and is not reestablished within 15 seconds after the prepurge, the ignition system will shut o

  

the Automatic Safety Shut-o

  Valves and 

LOCK OUT. 

For the 

120V models RESET

 the 

fl

 ame 

safeguard as described above. If burner still fails to light, turn it o

  and repeat from step 4 above. 

For the 

24V models RESET

 the 24 volt ignition Control Module by setting the operating control to 

OFF for at least 30 seconds. Then if necessary, refer to 

Section XII

 to isolate the problem.

 

 

 

 

           __________________________________________

1.  With the burner o

 , install a barb 

fi

 tting on the 

⅛″

 NPT pressure tap downstream of the pilot 

regulator.
2. Use 

fl

 exible tubing to hook up a manometer to the barb 

fi

 tting.

3.  Turn the burner to 

ON

. After the 30 second pre-purge, the pilot solenoid valve should open. 

With the pilot solenoid valve open, adjust the pressure with the pilot regulator based on the type of 
pilot that is installed. For internal pilots, set the pressure to 3.0

 W.C.. For external pilots, set the 

pressure to 1.5

 W.C..

 

 

 

 

           __________________________________________

1.  Open Manifold Gas Shut-o

  Valve, see Figure 5.

2.  Adjust the input signal to 2.0V DC.

Use the sight glass on the back plate of the burner to look at the low 

fi

 re. If light is visible 

through all of the holes in the burner plate, the low 

fi

 re is set within the range of operation of 

the burner. If light is not visible through all of the holes, then the low 

fi

 re is too low and the low 

fi

 re bypass located on the side of the ratio regulator, see Figure 9 item # 6, needs to be opened 

(counter-clockwise to open, clockwise to close).
 

 

 

 

          __________________________________________

VI                  Initial 
Start-up/Adjustment
for 120V and 24V 

!

!

            A    -  Initial  Light               
           Up

!

!

     i   -  Reset 120V

     ii   -  Reset 24V

     B   -  Pilot Pressure 

Pilot Gas Manifold
Pressure Tap

Pilot Gas
Pressure 
Regulator

Supply Gas
Pressure Tap

Main Manual
Gas Shut-off
Valve

Main Gas Pressure
Regulator

Figure 5  - 

 Pilot Gas Pressure Tap and Regulator

      C  - 

Low Fire 

                   Adjustment

Содержание Unipower V1

Страница 1: ...ctory for item availability Quality Designed for Proven Performance WARNING If the information in these instructions is not followed exactly a fire or explosion may result causing property damage pers...

Страница 2: ...5 1 19 1 26 1 Inlet Gas 4 NG pressure for maximum firing rate W C 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 Manifold gas NG pressure for maximum firing rate W C 5 0 3 4 3 9 3 9 4 3 4...

Страница 3: ...fasten the burner to the equipment either create four tapped holes on the front plate and use bolts to fasten the burner or install four threaded studs and fasten the burner with a washer and nut The...

Страница 4: ...main gas valve train to the union on the burner Figure 3 1 2 Connect the gas supply line to the shut o valve next to the main regulator Figure 3 2 3 Connect air pressure line from the compression fitt...

Страница 5: ...O Valve be installed outside Run full size pipe or tubing from regulator vent openings to outside of building Provide no traps in the vent lines and terminate away from all doors and windows also make...

Страница 6: ...to Figures 4A and 4B for Siemens control 120V On O switch 8 Neutral and 1 Ground refer to Figures 4C and 4D 24V Burner Models L1 Black L2 White and G Green refer to Figures 4E Note For 240 V versions...

Страница 7: ...M 4 BLOWER 10 F G BL BL W BL BR BR W BR W BR BK G O W BL W 14 15 BLOWER 16 Y R BL BL W BL G G 13 SCEBM 2 FAN W 15 6 B Y A 14 13 SCEBM 2 2 10V COM BL Y 24V RED ORN 120V SCEBM 2 24VAC 8 7 BK 6 8 4 9 BK...

Страница 8: ...2 2 BL O O W W 14 13 9 5 4 5 6 7 8 9 10 11 12 TERMINAL STRIP JUMPERS LEGEND F 5 SOLID WIRING AND DASHED WIRING AND ENCIRCLED FLAME SOLID ROUND OPEN ROUND COMPONENT 12 14 13 9 5 8 4 1 RELAY SOCKET COMP...

Страница 9: ...03 1 2 3 4 2 X2 01 3 1 4 3 2 1 X2 02 X6 03 1 3 2 X3 04 1 3 2 4 5 X2 03 2 3 1 X10 06 1 2 3 X10 05 2 1 4 5 X4 02 2 3 1 4 3 2 1 X7 04 X7 01 1 3 2 PME71 111A1 DISPLAY OFF Standby waiting for call for heat...

Страница 10: ...2 3 X10 05 2 1 4 5 X4 02 2 3 1 4 3 2 1 X7 04 X7 01 1 3 2 PME71 111A1 DISPLAY OFF Standby waiting for call for heat P24 Fan motor on Actuator opens in high fire P30 Prepurging P36 Actuator closes to ig...

Страница 11: ...OWER BK SCEBM 1 P3 P1 W P9 SCEBM 1 P11 SCEBM 1 BLOWER BLOWER P13 SCEBM 1 BLOWER Y R BL Y R BL 12 P2 SCEBM 1 TEMPERATURE CONTROL P4 SCEBM 1 O W O 2 1 9 7 8 10 SPARK SENSE W BK SE SP BR BR BR BL BL BL B...

Страница 12: ...the burner run and is not reestablished within 15 seconds after the prepurge the ignition system will shut o the Automatic Safety Shut o Valves and LOCK OUT For the 120V models RESET the flame safegu...

Страница 13: ...3 Turn the burner up to its actual firing rate applying an input signal of 10V DC for maximum firing rate 4 Confirm that the inlet pressure remains between the maximum and minimum values specified on...

Страница 14: ...o regulator See Figure 9 item 3 page 20 for location 2 Use flexible tubing to hook up a manometer to the barb fitting 3 Turn the burner on and adjust the temperature controller to its maximum setting...

Страница 15: ...to high fire by applying a 10V DC input signal Verify that the manifold pressure is the same as marked on the Burner Rating Label s for the actual firing rate ________________________________________...

Страница 16: ...5 Fill out the installation adjustment data tag and a x to the burner or gas utilization equipment NOTE For subsequent normal starting and shut o procedure refer to CONSUMER INSTRUCTIONS located in Se...

Страница 17: ...put gas pressure The motor used in this burner is variable speed By using this air pressure relation in the blower output gas pressure can be varied relative to the air pressure through a ratio regula...

Страница 18: ...l for heat Burner is Energized Pre purging sequence initialized Relay A is energized SCEBM 2 Control will read PRGE Blower accelerates to high speed Low pressure air switch is closed Pre purging Blowe...

Страница 19: ...on Flame safeguard initializes pilot flame for 10 seconds trial for ignition Pilot valve opened and spark initialized SCEBM 2 Control will read PIL Blower decelerates to lowest speed Did the pilot fla...

Страница 20: ...alized and begins 30 second pre purge Pilot initialization Honeywell S8760J initializes pilot flame for 15 second trial for ignition Pilot valve opened and spark initialized SCEBM 1 Control will shine...

Страница 21: ...termittent O O PRGE Open 100 Pilot On O PIL Closed Min On On RUN Open Modulate O On ERR Open Min Interrupted O O PRGE Open 100 Pilot On O PIL Open Min On On IGN Open Min O On RUN Open Modulate PRGE Pu...

Страница 22: ...n with the up and down arrows then pressing enter to save the selected setpoint Column 1 shows the menu parameters Arrow Keys Up and Down to navigate or adjust a menu parameter Right to access column...

Страница 23: ...when one connects a discharge temperature sensor as well as an external thermostat The SCEBM 2 still modulates the burner based on the discharge temperature and the temperature set point but in this...

Страница 24: ...ntrol signal B MOTOR RUNS CONTINUOUSLY PILOT WILL NOT LIGHT 1 Confirm that ALL Main Manual Shut O Valves are Open 2 After pre purge if the pilot flame is not proven within the pilot flame re establish...

Страница 25: ...l valve 1 leak Loc 13 Loc 13 Valve proving Fuel valve 2 leak Loc 14 Loc 14 POC error Error valve closure control POC Loc 22 Loc 22 Safety loop open Gas pressure switch max open Safety limit thermostat...

Страница 26: ...nc 8471 95 XVI Trouble Shooting for 120V Burners Continued E Siemens Control Sequence of Operation for 120V Burners Chart 9 Siemens Control Sequence of Operation 120V Burners Part 2 Service Trouble Sh...

Страница 27: ...meaning of the error and diagnostic codes see Error code list in Chart 8 Chart 10 Siemens Control Display of Flame Current 120V Burners F Siemens Control Display of Flame Current for 120V Burners XVI...

Страница 28: ...uring the burner run and the pilot is not re established after the pre purge the Ignition Control Module will lock out RESET the 24 volt ignition Control Module by setting the operating control to OFF...

Страница 29: ...to V10 2 2101 01 Burner Housing V2 3 N A Main Gas Manifold Pressure Tap 4 N A Manual Firing Valve 5 N A Air Pressure Tap 6 8416 14 Low Fire By Pass 7 8416 04 Dungs FRG Ratio Regulator Item Part Descri...

Страница 30: ...p 6 8416 14 Low Fire By Pass 7 8416 04 Dungs FRG Ratio Regulator 8 8402 42 Main Gas Solenoid Valve 1 9 8402 42 Main Gas Solenoid Valve 2 10 8416 05 Main Gas Regulator 11 8404 67 Main Manual Gas Shut o...

Страница 31: ...ld Casting 2 8699 30 Air Pressure Tubing to Dungs FRG 3 8699 30 Air Pressure Pickup Tube 4 8433 24 Spark Rod 5 2112 01 Pilot 6 8433 25 Flame Rod 7 8699 30 Pilot Gas Line 8 8699 30 Air Pressure Tubing...

Страница 32: ...using Rear 24V Burners 1 N A Aluminum Manifold Burner Casting 2 8699 30 Air Pressure Tubing to Dungs FRG 3 8699 30 Air Pressure Pickup Tube 4 8433 24 Spark Rod 5 2112 01 Pilot 6 8433 25 Flame Rod 7 86...

Страница 33: ...ot 2 8433 25 Flame Rod 3 8433 24 Spark Rod 4 N A Burner Gas Manifold 5 N A Gas Orifices 6 2122 10 High Temperature Flange Gasket 7 2113 50 Side Plate 8 N A Main Gas Manifold Pressure Tap 9 2110 00 Ba...

Страница 34: ...65 9 33 15 35 1 2112 01 Pilot 2 8433 25 Flame Rod 3 8433 24 Spark Rod 4 N A Main Gas Manifold Pressure Tap 5 2113 50 Side Plate 6 2110 00 Ba e 7 2122 10 High Temperature Flange Gasket Item Part Descr...

Страница 35: ...ens Control Box 120V Burner 1 8429 78 SCEBM 2 Fan Control 2 8447 28 120 208 24vac 24V 40VA Transformer 3 8402 50 Pilot Solenoid Valve 4 8409 25 Terminal Block 5 8406 98 99 Relay B 6 8406 95 96 Relay A...

Страница 36: ...06 Control Box Shelf 4 8429 57 Ignition Control 5 8429 02 SCEBM 1 6 8447 34 100VA Main 24VAC Transformer 7 8406 58 24VAC Relay 8 8408 78 120VAC Terminal Strip 9 8406 83 Nine Second Relay Timer 10 840...

Страница 37: ...shed within 10 seconds after the pre purge the controller will shut o the automatic safety shut o valves and lockout 6 Reset the flame safeguard 7 Repeat step 4 for restart To shut o 1 Close manual ga...

Страница 38: ...ag b Protected from shipping damage c Received transportation pre paid at Midco International Inc Return Goods Dept 4140 West Victoria Street Chicago Illinois 60646 6727 d Found by Midco s inspection...

Страница 39: ...returned scrapped repaired or replaced as instructed by the customer Products returned to the customer will be sent shipping charges collect Call factory for information 866 705 0514 Fill out form an...

Страница 40: ...95 ISO 9001 C O MPAN Y R E G ISTER E D Midco International Inc 4140 West Victoria Street Chicago Illinois 60646 toll free 866 705 0514 tel 773 604 8700 fax 866 580 8700 web www midcointernational com...

Отзывы: