6 I
NSTALLATION
C
HECKLISTS
Use these codes to complete the tables in this section, then initial and date each section. If the
table has an
Initial / Date
column, the person completing the procedure should enter their initials
and the date.
P
Pass
. Indicates that this procedure has been successfully completed without error.
F
Fail
. Indicates that this procedure has been unsuccessful and prevents the analyzer
from being installed for use.
N/A
Not Applicable
. Indicates that this procedure does not apply to your system.
Procedure
Evaluation
Code
Initial / Date
Review the
Pre-installation Instructions and Checklist
document and ensure that the laboratory is prepared for
installation.
P
F
N/A
Ensure that the required personnel are available.
P
F
N/A
Ensure that all equipment has been unpacked and verified
using the packing list.
P
F
N/A
Prepare for Installation
Procedure
Evaluation
Code
Initial / Date
Ethernet switch was connected and configured.
P
F
N/A
Connect Cables
Procedure
Evaluation
Code
Initial / Date
Install the components of the vacuum pump.
P
F
N/A
Check the pump voltage setting.
P
F
N/A
Connect the vacuum pump to analyzer.
P
F
N/A
Power ON the vacuum pump switch (if applicable).
P
F
N/A
Power ON the analyzer.
P
F
N/A
Install the Vacuum Pump
6 Installation Checklists
Smart VacPrep Installation Instructions and Checklist
067-42870-02 (Rev A) — June 2022
6 - 1