5 Troubleshooting
C
LEAN THE
G
AS
D
ELIVERY
T
UBES
If using a FlowPrep, gas delivery tubes should be wiped with a clean, lint-free cloth after each use
to remove any particles of sample that may have adhered to the tube. If a gas delivery tube
becomes clogged or damaged, it should be replaced.
1. Remove the gas delivery tube from the flexible tubing.
2. Attach a new gas delivery tube by pressing the flexible tubing over the gas delivery tube.
Ensure that the flexible tubing completely covers the ferrule at the end of the gas delivery
tube.
L
UBRICATE THE
E
LEVATOR
D
RIVE
A
SSEMBLY
The elevator screw is lubricated before it leaves the factory and should not require lubricating. If
the elevator starts to vibrate or becomes noisy when traveling, contact a Micromeritics Service
Representative for disposition.
Should lubrication become necessary, apply a light coat of Teflon Magnalube-G grease
[
Micromeritics part number 004-16163-00
] to the elevator screw. Do not grease the guide rods.
P
OWER
I
NSTRUMENT
O
N AND
O
FF
DO NOT connect or disconnect cables when the instrument is powered ON.
Power ON the equipment in the following order:
1. Analyzer.
2. External vacuum pump (the pump must warm approximately two hours before performing
analyses).
Power OFF the equipment in the following order
1. Analyzer.
2. External pump.
5 - 18
Gemini VII Keypad Operator Manual
239-42801-01 (Rev E) — July 2021
Содержание GEMINI VII KEYPAD
Страница 1: ...OPERATOR MANUAL 239 42801 01 July 2021 Rev E GEMINI VII KEYPAD SURFACE AREA ANALYZER...
Страница 10: ......
Страница 14: ......
Страница 30: ......
Страница 52: ......
Страница 108: ......
Страница 146: ......
Страница 148: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......