3. If using a Check Seal, verify that the Check Seal opener is installed in the sample port.
4. To attach the sample tube set to the degas port, push the sample tube in to a full stop. Secure the
sample tube in place by sliding the connector nut, ferrule, and O-ring up onto the degas port and
turning the connector nut clockwise. Tighten the nut securely by hand.
5. Place a heating mantle over the sample tube bulb and secure the mantle in place with a mantle
clip.
6. Insert the heating mantle thermocouple plug into the thermocouple connector.
7. Insert the heating mantle power plug into the power connector and twist the power plug to lock
securely.
8. After installing the sample tubes, install the safety shield around the sample tubes and heating
mantles to minimize the risk of receiving a burn by touching hot components.
O
IL
B
ASED
V
ACUUM
P
UMP
I
NSPECT AND
C
HANGE
V
ACUUM
P
UMP
O
IL
The equipment shown in this section may differ slightly from yours.
However, the process is the same unless otherwise noted.
This procedure is also shown in the
How-To Tutorials
located on the
Help
menu.
Oil Based Vacuum Pump
Smart VacPrep Operator Manual
6 - 3
Содержание Gemini VII 2390a
Страница 1: ...Gemini VII Operator s Manual V3 02 239 42828 01 Jan 2014...
Страница 4: ......
Страница 12: ...Table of Contents Gemini VII viii 239 42828 01 Nov 2013...
Страница 36: ...Menu Structure Gemini VII 2 14 239 42828 01 Dec 2012...
Страница 192: ...Service Test Gemini VII 6 24 239 42828 01 Dec 2012...
Страница 217: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 25 Isotherm Linear Plot...
Страница 218: ...Report Examples Gemini VII 7 26 239 42828 01 Dec 2012 BET Surface Area Report...
Страница 219: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 27 BET Surface Area Plot...
Страница 220: ...Report Examples Gemini VII 7 28 239 42828 01 Dec 2012 t Plot...
Страница 221: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 29 BJH Adsorption Cumulative Pore Volume...
Страница 222: ...Report Examples Gemini VII 7 30 239 42828 01 Dec 2012 BJH Adsorption dV dlog w Pore Volume...
Страница 264: ......
Страница 266: ......
Страница 294: ...Appendix B Gemini VII B 28 239 42828 01 Nov 2013...
Страница 364: ...Appendix F Gemini VII F 18 239 42828 01 Dec 2012...
Страница 372: ...Gemini VII Smart VacPrep Operator Manual Dec 2013 G 1 G Smart VacPrep Operator Manual...
Страница 373: ...OPERATOR MANUAL Smart VacPrep Operator Manual Nov 2013 SMART VACPREP INTELLIGENT VACUUM SAMPLE PREPARATION SYSTEM...
Страница 380: ...Contact Us vi Smart VacPrep Operator Manual...
Страница 390: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Страница 424: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...