Gemini VII
Connecting Gases
239-42828-01 - Dec 2012
9-19
2.
Both gauges should read at or near zero. If not, open the regulator gas shut-off valve to release
gas. It is not necessary to disconnect the gas line from the regulator or the instrument.
3.
Use an appropriate wrench to loosen the nut at the regulator/gas bottle connection then remove
the regulator from the bottle.
4.
Replace the protective cap on the depleted bottle. Disconnect the retaining strap and remove the
bottle from its current location.
Connecting a Replacement Gas Bottle
Move the replacement bottle close to the instrument and tether it into place. It is not necessary to dis-
connect the gas line from the regulator or the instrument.
1.
Use an appropriate cylinder wrench to remove the protective cap from the replacement bottle.
When connecting hazardous gases, ensure there is proper ventilation and always
follow the safety procedures established for your lab.
A power failure or loss of cryogen can result in dangerous pressures in the sample
tube. The analyzer uses pressure relief valves to vent this pressure into the instrument
cabinet and return the instrument to a safe condition. When using toxic or flammable
gases, additional venting of the cabinet may be required.
Regulator gas shut-
off valve
Содержание Gemini VII 2390a
Страница 1: ...Gemini VII Operator s Manual V3 02 239 42828 01 Jan 2014...
Страница 4: ......
Страница 12: ...Table of Contents Gemini VII viii 239 42828 01 Nov 2013...
Страница 36: ...Menu Structure Gemini VII 2 14 239 42828 01 Dec 2012...
Страница 192: ...Service Test Gemini VII 6 24 239 42828 01 Dec 2012...
Страница 217: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 25 Isotherm Linear Plot...
Страница 218: ...Report Examples Gemini VII 7 26 239 42828 01 Dec 2012 BET Surface Area Report...
Страница 219: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 27 BET Surface Area Plot...
Страница 220: ...Report Examples Gemini VII 7 28 239 42828 01 Dec 2012 t Plot...
Страница 221: ...Gemini VII Report Examples 239 42828 01 Dec 2012 7 29 BJH Adsorption Cumulative Pore Volume...
Страница 222: ...Report Examples Gemini VII 7 30 239 42828 01 Dec 2012 BJH Adsorption dV dlog w Pore Volume...
Страница 264: ......
Страница 266: ......
Страница 294: ...Appendix B Gemini VII B 28 239 42828 01 Nov 2013...
Страница 364: ...Appendix F Gemini VII F 18 239 42828 01 Dec 2012...
Страница 372: ...Gemini VII Smart VacPrep Operator Manual Dec 2013 G 1 G Smart VacPrep Operator Manual...
Страница 373: ...OPERATOR MANUAL Smart VacPrep Operator Manual Nov 2013 SMART VACPREP INTELLIGENT VACUUM SAMPLE PREPARATION SYSTEM...
Страница 380: ...Contact Us vi Smart VacPrep Operator Manual...
Страница 390: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Страница 424: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...