Page 13
Installation and Assembly
optoNCDT ILR2250
5.2
Mechanical Fastening
5.2.1
Sensor Mounting
i
Ensure careful handling of the sensor during installation and operation.
Mount the sensor on the sensor base plate using four M4 screws.
Additionally, 4 grub screws can be used to adjust the sensor.
A visible laser beam helps to align the sensor with the target object. Please also refer to the notes for operation,
If the laser beam does not strike the object surface at a perpendicular angle, measurements might be inaccurate.
Bolt connection
1
Bolt length
Screwing depth
Number Screw
Torque
5 mm
Min. 10 mm
4
M4 ISO 4762-A2
1.7 Nm for strength class 70
2.3 Nm for strength class 80
Fig. 6 Installation conditions
i
Mount the sensor only to the existing through-bores on a flat surface. Any type of clamping is not permitted.
Never exceed the specified torques.
102 (4.0)
53
(2.1)
65 (2.6)
29
(1.1)
29 (1.1)
5
(.20)
70
(2.8)
50
(2.0)
4 x M4
2 x 4.8 x 45
ø32
(1.3 dia)
60
(2.4)
55 (2.2)
Fig. 7 Dimensional drawing optoNCDT ILR2250-100, dimensions in mm
i
Position the sensor so that the connections and display elements are not concealed.
We recommend maintaining a clearance of 2–3 centimeters at the cooling ribs on the left and right sides.
1) Recommendation: Test under use conditions!