RYZ
ASSEMBLY
Carry out the assembly of the new chassis proceeding in the
reverse order.
N.B.:
Before assembling the new chassis, ensure that the VIN
number is engraved and the chassis plate affi xed.
CHASSIS 4-15
TIGHTENING TORQUE SPECIFICATIONS
SECURING DEVICES
Front wheel shaft bolt
Front wheel shaft tightness torque:
Fork tube drain bolt
Fork tube plug
daN·m
N·m
45
12
4,5
1,2
23
2,3
20
2,0
SERVICING MATERIALS REQUIRED
MATERIALS
Air fi lter oil
Forks hydraulic fl uid
RECOMMENDED MH PRODUCT
USE
Adhesive oil for the air fi lter sponge
Filling the front fork tubes
Motul Air Filter Oil
SAE 15 (Esso Univis N N46) type
SPECIAL TOOLS
254002000198
Safety spanner (3 mm)
254002000199
Safety spanner (4 mm)
4
Содержание RYZ 50 Cross C
Страница 4: ...RYZ NOTES...
Страница 6: ...RYZ NOTES...
Страница 10: ...RYZ NOTES...
Страница 38: ...RYZ NOTES...
Страница 40: ...RYZ TIGHTENING TORQUE SPECIFICATIONS 5 29 SERVICING MATERIALS REQUIRED 5 29 SPECIAL TOOLS 5 30 5 2 ENGINE 5...
Страница 82: ...RYZ NOTES...
Страница 90: ...RYZ NOTES...
Страница 91: ......