background image

Comet 

EX

treme

4.5/6/9/12 kVA

Start-Up Guide

Содержание 12 kVA

Страница 1: ...Comet EXtreme 4 5 6 9 12 kVA Start Up Guide...

Страница 2: ...ation Items included in 4 5 6 kVA tower configuration battery module electronics module transformer optional battery module electronics module transformer optional battery module NOTE Connection and o...

Страница 3: ...See Figure 1 2 3 Remove terminal block cover 3 on I O Box 2 4 Remove cable entry knockouts 4 at rear of I O Box 2 5 Insert cables for input power left and output power right thru knockouts Be sure cab...

Страница 4: ...to the INPUT terminal block L1 L2 L1 L2 INPUT OUTPUT L1 L2 L3 INPUT OUTPUT 120 104 N 104 120 208 VAC FROM UTILITY TO LOAD 208 VAC I O BOX TO LOAD 120 VAC 208VAC 240VAC OR TO OPTIONAL POWER DISTRIBUTI...

Страница 5: ...FROM UTILITY 4 5 6 KVA ISO TRANSFORMER 240 VAC INPUT L1 L2 L3 NEUT OUTPUT 104A 104B 120A 120B GND 208 240 208 VAC 240 VAC L1 INPUT OUTPUT 4 5 6 KVA UPS L2 L1 L2 208 VAC INPUT FROM UTILITY 4 5 6 KVA IS...

Страница 6: ...CK LAYOUT NOTE UPS AND ISOLATION TRANSFORMER ARE FACTORY CONFIGURED AT 208 VAC 208 VAC FROM UTILITY I O BOX TO LOAD 208 VAC TO LOAD 120 VAC 208VAC 240VAC OR TO OPTIONAL POWER DISTRIBUTION MODULE PDM O...

Страница 7: ...figured with software 9 12 KVA XFMR SCHEMATIC 208 VAC INPUT H1 H2 OUTPUT AT 208 VAC TRANSFORMER INPUT L1 X7 X6 X1 X5 L2 104 120 GND N 104 120 104 120 GND N 104 120 X4 X3 X2 NOT USED IN 208 VAC APPLICA...

Страница 8: ...L1 L2 L3 INPUT OUTPUT 120 104 N 104 120 TO LOAD 120 VAC 208VAC 240VAC OR TO OPTIONAL POWER DISTRIBUTION MODULE PMM L1 L2 L3 INPUT OUTPUT 120 104 N 104 120 TO LOAD 120 VAC 208VAC 240VAC OR TO OPTIONAL...

Страница 9: ...B 120A 120B GND 208 240 4 5 6 KVA ISO TRANSFORMER 240 VAC INPUT L1 L2 L3 NEUT 104A 104B 120A 120B GND 208 240 240 VAC INPUT OUTPUT OUTPUT L1 INPUT OUTPUT 9 12 KVA UPS L2 L1 L2 208 VAC INPUT FROM UTILI...

Страница 10: ...battery circuit breaker is OFF 3 5 1 2 Connect cable to the connectors of the electronic and battery modules Input Battery CB Battery Cable Connector Battery Cable BATTERY 3 BATTERY 2 BATTERY 1 UPS T...

Страница 11: ...rmation 4 1 Battery Scan Test This procedure is a test for each battery to verify it is in basic working order To verify it holds a charge batteries should be charged for several hours before testing...

Страница 12: ...s in the ON position 4 1 10 After approximately 30 seconds at least one of the four yellow LEDs on the front panel of the UPS should be lit Additionally the Battery Input LED 20 on the front panel of...

Страница 13: ...tected equipment one load at a time If the UPS beeps an alarm when you start your equipment the UPS may be overloaded 4 2 4 The four LEDs on the right side of the front of the UPS show the percent of...

Страница 14: ...w w w m g e u p s c o m 1660 Scenic Avenue Costa Mesa California 92626 714 557 1636...

Отзывы: