Meyer Lot Pro Скачать руководство пользователя страница 1

Form No. 1-1106 

April 2014

EZ Build Assembly and Installation

41325 Lot Pro Plow with E-72 12V Hydraulic Unit

© 2014 Printed in the U.S.A.

Meyer Products LLC

18513 Euclid Ave. • Cleveland, Ohio 44112-1084

Phone 216-486-1313

www.meyerproducts.com• email [email protected]

Meyer Products LLC reserves the right, under its continuing product 
improvement program, to change construction or design details, 
specifi cations and prices without notice or without incurring any obligation.

Содержание Lot Pro

Страница 1: ...eyer Products LLC 18513 Euclid Ave Cleveland Ohio 44112 1084 Phone 216 486 1313 www meyerproducts com email info meyerproducts com Meyer Products LLC reserves the right under its continuing product im...

Страница 2: ...llow these instructions explicitly Warranty does not apply to a Meyer product which has been negligently or improperly assembled or installed ADDITIONAL BATTERY CONNECTIONS 1 When attaching cables to...

Страница 3: ...ted Nut 1 8 30 22398 1 King Bolt 1 8 x 5 1 2 31 22436 2 Pin 1 x 3 32 22692 1 Plow Side Harness 33 22866 1 SAE Mx3 8 90 Degree Elbow 34 22883 1 Hose 1 4 x 22 E 72 PKG Item Part No Qty Description 41301...

Страница 4: ...1325 E 72 Specific Components 3 41325 E 72 Assembly 9 7 15 24 34 11 10 16 22 34 1 33 2 3 4 5 6 8 12 13 14 17 18 19 21 2 3 4 20 23 25 26 27 28 29 30 31 23 23 23 23 26 47 48 49 62 63 64 56 57 59 8a 8b 8...

Страница 5: ...t 3 8 16 85 20305 20305 20305 20305 20305 10 Locknut 3 8 16 86 20353 8 Flatwasher 3 8 86 20353 20353 20353 20353 20353 10 Flatwasher 3 8 Lot Pro Poly Stainless Parts List Item LP 7 5 LP 8 0 LP 8 5 LP...

Страница 6: ...prings 36 to Pivot Bar 6 making certain locknuts are positioned as shown below E Make certain each Eye Bolt 55 is in a vertical position as shown below so that the Eye Bolt 55 and Trip Spring 36 hinge...

Страница 7: ...uck Side Harness 54 from any hot moving parts with tie wraps as needed I Drill a 1 1 4 Diameter Hole thru firewall to install split bushing 52 and extend the harness into the cab of the vehicle Fused...

Страница 8: ...troller operation M After all electrical connections have been made the drop speed of the plow may be evaluated adjusted To adjust loosen the hex nut and adjust in to slow the drop speed and out to ma...

Страница 9: ...frame D Adjust crankstand until it is no longer in contact with the ground C Push back on lift frame until both pins spring thru mount on vehicle B Twist handles on both sides to engage spring loaded...

Страница 10: ...pushing the lift frame towards vehicle pull handles on either side to disengage pins then twist until the leg locks the pin in the open position G Disconnect one piece electrical plug and install wea...

Страница 11: ...plow cannot bump hyd unit Controller Operation Controller Turns Off when vehicle shut off Plow Operation Up Plow Operation Left Plow Operation Right Plow Operation Down Plow Drop Speed Adjusted Plow L...

Страница 12: ...and A CURB ADJ BOX FIXED COMPLETE PART NO DESCRIPTION Steel Rubber Urethane Molded Rubber Poly GUARDS WINGS WINGS WINGS KIT 09400 LP 7 5 STEEL 08178 08189 08119 12039 08109 12078 08344 08380 08104 081...

Отзывы: