![Metso NELDISC L4 Series Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/metso/neldisc-l4-series/neldisc-l4-series_intallation-maintenance-and-operating-instructions_1780151007.webp)
2 L6 70 en
7
3.2.1
Valve insulation
If necessary, the valve may be insulated. Insulation must not
continue above the upper level of the valve body, see Fig-
ure 9.
3.3
Actuator
When installing the actuator on the valve, make sure that
the valve package functions properly. See instructions for
installing in Section 6.
Observe the space needed for removal of the actuator.
The upright position is recommended for the actuator cyl-
inder.
The actuator must not touch the pipeline, because pipeline
vibration may damage it or interfere with its operation.
In some cases, e.g. when a large-size actuator is used or
when the pipeline vibrates heavily, supporting the actuator
is recommended. Please contact Metso’s Automation busi-
ness for further information.
4
COMMISSIONING
Ensure that no dirt or foreign objects are left inside the
valve or pipeline. Flush the pipeline carefully. Keep the
valve 30–40° open during flushing.
When starting up the pump, ensure that the valve in the
pipeline is closed or, at the very most, 20° open.
A waterhammer, which follows the start-up of high-capac-
ity pumps, creates a torque peak in the disc. This can dam-
age the pin connection between disc and shaft when the
valve is 30–90° open.
The packing construction is live loaded. If the leakage
occurs, re-tighten the gland nuts but don't exceed the val-
ues in the Tables 7, 8 and 9 by 50 % or do not fully compress
the disc springs.
5
MAINTENANCE
5.1
Maintenance general
Although Metso’s Neles valves are designed to work under
severe conditions, proper preventative maintenance can
significantly help to prevent unplanned downtime and in
real terms reduce the total cost of ownership. Metso recom-
mends inspecting the valves at least every five (5) years. The
inspection and maintenance interval depends on the actual
application and process condition. The inspection and
maintenance intervals can be specified together with your
local Metso experts. During this periodic inspection the
parts detailed in the Spare Part Set should be replaced.
Time in storage should be included in the inspection inter-
val.
Maintenance can be performed as presented below. Fo
maintenance assistance, please contact your local Metso
office. The part numbers in the text refer to the exploded
view and to the parts list in Section 9, unless otherwise
stated.
Table 5.
Stud bolt dimensions (mm), L4F/D
ASME Class 600 flanges
Size
NPS
Thread
K
øH
mm
L
L1
L2
Length
Qty
Length
Qty
04
7/8-UNC
25,4
210
8
-
-
-
06
1-8UN
28,4
250
12
-
-
-
08
1 1/8-8UN
31,7
290
12
-
-
-
10
1 1/4-8UN
-
340
12
160
8
40
12
1 1/4-8UN
-
410
16
170
8
45
14
1 3/8-8UN
-
440
16
170
8
44
16
1 1/2-8UN
-
490
16
200
8
60
20
1 5/8-8UN
-
540
20
210
8
48
24
1 7/8-8UN
-
610
20
230
8
60
28*
2-8UN
-
680
24
250
8
60
32*
2 1/4-8UN
-
710
28
230
8
55
36*
2 1/2-8UN
-
770
28
260
8
60
*) flanges acc. to ASME B16.47 series A
Table 6.
Stud bolt dimensions (mm), L6F
ASME Class 600 flanges. Both flanges included
Size
NPS
Thread
K
L
L1
Length
Qty
Length
Qty
06
1 UNC
165
8
135
4
08
1 1/8 - 8UN
190
16
140
8
10
1 1/4 - 8UN
215
20
160
12
12
1 1/4 - 8UN
220
24
160
16
14
1 3/8 - 8UN
235
24
170
16
16
1 1/2 - 8UN
255
24
190
16
18
1 5/8 - 8UN
275
24
210
16
24
1 7/8 - 8UN
330
32
230
16
28
2 - 8UN
364
48
257
84
30*
2 - 8UN
370
40
260
16
36*
2 1/2 - 8UN
410
40
280
16
*) flanges acc. to ASME B16.47 series A
Fig. 9
Insulation of the valve
Insulation limit
CAUTION:
Observe the safety precautions mentioned in Section
1.7 before maintenance!
CAUTION:
When handling the valve or the valve package as a
whole, bear in mind the weight of the valve or the
entire package.
CAUTION:
For safety reasons the retaining plates MUST always
be installed according to Section 5.3.
NOTE:
When sending goods to the manufacturer for repair, do
not disassemble them. Clean the valve carefully and flush
the valve internals.
For safety reasons, inform the manufacturer of the type of
medium used in the valve (include material safety data
sheets (MSDS)).
NOTE:
In order to ensure safe and effective operation, always use
original spare parts to make sure that the valve functions
as intended.
Содержание NELDISC L4 Series
Страница 34: ...34 2 L6 70 en ...
Страница 35: ...2 L6 70 en 35 ...