Page
34
of
48
4.4 CG Spray Head Reassembly
Screw
the
Air
Cover over the Air
Cap. Hand tighten
firmly but
NOT
excessively.
5
With both ‘O’ Rings fitted to the Transfer Plug,
lubricate the larger ‘O’ Ring lightly with silicon
grease.
Press the Transfer Plug
into the Contact Tube
Support Block until the
largest
diameter
touches the rear of the
block.
1
Once all Spray Head parts have been cleaned and any damaged parts have been renewed, the Spray Head can be reassembled
using the following technique:
Select the correct Contact Tips for the wire being sprayed.
Push the Contact Tubes through the Contact Tube Support
Block until they bottom out and they protrude from the front
face of the seat of the block.
2
Place the Air Concentrator in the seat of the Contact Tube
Support Block with the Contact Tubes passing through the
Air Concentrator.
3
Place the Air Cap over the Air Concentrator.
4
Содержание ARC150-2310D
Страница 1: ...Page 1 of 48 ssue 21 11 11 ...
Страница 14: ...Page 14 of 48 SECTION 2 THE EQUIPMENT 2 1 System Configurations ...
Страница 41: ...Page 41 of 48 SECTION 5 FAULT FINDING 5 1 Operational Troubleshooting ...
Страница 43: ...Page 43 of 48 SECTION 6 ILLUSTRATED PARTS LIST 6 1 Main Components 6 2 CG Spray Head ...
Страница 46: ...Page 46 of 48 SECTION 7 INFORMATION TABLES 7 1 Typical Performance Figures ...