Section 8 - Checklists
Page 72
90-8M0128975
eng
JUNE 2017
Predelivery Inspection (PDI)
IMPORTANT: This checklist is for packages that are not equipped with Joystick Piloting for Sterndrive (JPS). For engine
packages equipped with JPS, use the JPS‑specific checklist, which appears in the JPS Operation Manual.
Perform these tasks before the Customer Delivery Inspection (CDI).
N/A Check/
Adjust Item
⃞
⃞
Service bulletin updates or repairs completed
⃞
Drain plug installed and drain valves closed
⃞
⃞
Seawater inlet valve open
⃞
Engine mounts tight
⃞
⃞
Engine alignment
⃞
⃞
Drive unit fasteners tightened to specifications
⃞
⃞
Power trim cylinders fasteners tight
⃞
Battery of proper rating, fully charged, secured, with protective covers in place
⃞
All electrical connections tight
⃞
Exhaust system hose clamps tight
⃞
All fuel connections tight
⃞
Correct propeller selected, installed, and tightened to specifications
⃞
Throttle, shift, and steering system fasteners tightened to specifications
⃞
⃞
Test OBDM warning system and MIL (light) operation (EC models only)
⃞
Steering operation throughout range
⃞
Throttle plates open and close completely
⃞
Crankcase oil level
⃞
⃞
Power trim oil level
⃞
⃞
Sterndrive unit oil level
⃞
⃞
Power steering fluid level
⃞
⃞
Closed cooling fluid level
⃞
⃞
Transmission fluid level
⃞
⃞
V‑engines: serpentine belt tension
⃞
⃞
Alternator belt tension (3.0L)
⃞
⃞
Power steering pump belt tension (3.0L)
⃞
⃞
SmartCraft gauges calibrated, if equipped
⃞
⃞
Warning system operation
⃞
⃞
Trim limit switch operation
Содержание 6.2 TowSport MPI
Страница 1: ...T6200 T6200 H O TowSport OPERATION AND MAINTENANCE MANUAL...
Страница 2: ......
Страница 8: ...Page iv 90 8M0128975 eng JUNE 2017...
Страница 60: ...Section 4 Maintenance Notes Page 52 90 8M0128975 eng JUNE 2017...
Страница 86: ......