mcr S-THERM smoke exhaust vents: C, E, NG-A. OPERATION AND MAINTENANCE MANUAL
Page 19 of 41
5.6.
Assembly of the opening system
NOTE: Before installing the opening system, the temporary net (if already installed) and the
temporary consoles must be removed in reverse order to the steps described on page 16.
The opening system must be placed in the axis of the smoke exhaust vent:
`
Fig. 31 Mounting the opening system in the vent axis.
After placing the opening system on the frame, fix it to the base with self-drilling screws 6.3x32:
Fig. 32 Fastening the opening system traverse to the vent base.
Hinge axis
Vent axis
Axis of the
opening
system