background image

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Step 9

Fix the door to the building using 

16x30mm black screws per hinge 

as shown in the diagram.

16x30mm Black Screws

Pre drill 

hole

Fit the turn buttons to the 

building using 2x30mm black 

screws.

Step 10

Fit the fascia’s and the finial’s to the 

building using 14x30mm screws as 

shown in the diagram.

14x30mm Screws

Pre drill 

hole

30mm 

screw

Fit the door rail using 3x40mm 

screws.

Pre drill 

hole

40mm 

screw

15

8

30mm 

screw

2x30mm Black Screws

Pre drill 

hole

30mm 

screw

20

2x40mm Screws

21

Отзывы: