Mercia Garden Products 02DTSHAX05051W-V1-PEFC Скачать руководство пользователя страница 1

02DTSHAX05051W-V1-PEFC

5x5 Playhouse

In all instances for assistance with your product, please contact customer care on :  

01636 821215 or [email protected]

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

Please retain product label and instructions for future reference

        

General Instructions

BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed in the parts list provided. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a 

Phillips screwdriver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and 

a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

- Ensure you have enough time to build the product to ensure the building is water tight.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration 

of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may 

also occur during excessive dry spells due to natural processes. Unfortunately, these processes cannot be 

avoided but can be helped. It is suggested that the outdoor building is sprayed with water during 

extended periods of hot weather and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually 

to prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot 

guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a water-

proof treatment to prevent water ingress. Pressure Treated buildings - Require a waterproof treatment to 

prevent water ingress. Log Cabins - Are supplied untreated and require a preservative and waterproofing 

treatment.

We also recommend treating the building prior to construction.

POSITIONING YOUR PLAYHOUSE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment. 

We recommend a 

minimum space of 2m around a playhouse

, away from any structure or obstructions 

such as fences, garages, houses, overhanging branches, washing lines or electrical wires.

It is recommended that the position of the Playhouse is

 not in direct sunlight.

Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or 

any hard surface.

BUILDING A BASE 

Ensure the base is level and is built on firm ground, to prevent distortion, checking with a spirit level.  

Refer to diagrams for the base dimensions.  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is 

also recommended that the floor be at least 25mm above the surrounding ground level to avoid 

flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

- Wooden base.

CAUTION 

Wood is a natural product and can change post manufacture. So despite every effort being 

made to ensure the materials used are cut and machined to a clean and smooth finish, care 

must be taken when handling the product and preparing for use by your child.

Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a 

smoother finish. Alternatively, call the customer service department who will be happy to 
arrange replacement panels/parts.

 

WARNING: 

ONLY SUITABLE FOR DOMESTIC USE.

TO BE USED UNDER DIRECT SUPERVISION OF AN   ADULT.

THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY.

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY   

 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

ANY ADD ON OR ACCESSORY MUST BE FITTED ACCORDING TO 
THE INSTRUCTIONS PROVIDED

.

!

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens products 

independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.

2mm Drill bit

12mm CSK

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be erected by 

atleast two adults.

DO NOT ALLOW 

CHILDREN TO ASSIST.

To prevent damage during 

assembly, you 

MUST

 pilot 

drill all screw holes and 

ensure all screw heads are 

countersunk.

For ease of assembly, you will 

need a tape measure to check 

dimensions of components.

**Protim Aquatan T5 (621)

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the correct application of 

Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and 

alcohols: 2, 4, 6-trichlorophenol.

www.merciagardenproducts.co.uk      P1

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

WARNING: Only for domestic use

Not suitable for children under 36 months due to 

small gaps and danger of falling from heights.

To be used under direct supervision of an adult

Содержание 02DTSHAX05051W-V1-PEFC

Страница 1: ...BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly smaller than the ext...

Страница 2: ...er SI 002 001 0006 5x5 Playhouse With Half Glazed Door Tower Slide SI 002 001 0007 5x5 Playhouse With Half Glazed Door Tower Slide Swing SI 002 001 0008 Model Build Instructions Required 02DTSHAX05051...

Страница 3: ...ns Required 02DTSHAX05051W V1 PEFC Playhouse 02DTSHAX05051W V1 PEFC Playhouse 02DTTWR6565 V1 PEFC Tower 002DTSHAX05051W V1 PEFC Playhouse 02DTTWR6565 V1 PEFC Tower 02PATINCSWA V1 PEFC Swing Set 002DTS...

Страница 4: ...Door Tower SI 002 001 0023 5x5 Playhouse With Boarded Door Tower Slide SI 002 001 0024 5x5 Playhouse With Boarded Door Tower Slide Swing SI 002 001 0025 Model Build Instructions Required 02DTSHAX05051...

Страница 5: ...AX05051W V1 PEFC 2 1 3 4 Door Gable QTY 1 AI 02S11AGSD1W1410X1491 V1 Plain Side Left QTY 1 AI 02S11PPVRL1500X1165 V1 Plain Side Right QTY 1 AI 02S11PPVRR1500X1165 V1 Plain Gable QTY 1 AI 02S11AGP1410X...

Страница 6: ...Screw x 80 50mm Screw x 32 40mm Screw x 32 Felt Tacks x 60 30mm Black Screw x 14 Nail Bag There may be extra screws present in the nail bag 20mm Screw x 7 16mm Screw x 3 Pre Assembly Before assemblin...

Страница 7: ...aking sure the end board is flush with the framing Fix using 2 x 30mm screws for each board along the dotted lines shown on the illustration 50x30mm screws 30mm screw 6 8 7 6 8 7 1 2 Pre drill hole St...

Страница 8: ...h the roof sheet at the top Make sure to attach the roofs to the ridge bar 6x30mm screws 24x40mm screws 40mm screw 30mm screw 5 5 12 1 2 Pre drill hole 12 5 30mm screw 1 2 Pre drill hole 13 Step 7 Par...

Страница 9: ...20 2 20 10 Step 10 Parts needed At the back of the building fix the two Cover Trims No 10 to either end of the side panels Use 3x30mm screws per trim 6x30mm screws 30mm screw 1 2 Pre drill hole 10 10...

Страница 10: ...3 If you have purchased a Half Glazed Door please continue to Step 13a on page 11 If you have purchased a Framed Door please skip and continue from Step 13b on page 12 If you have purchased a Boarded...

Страница 11: ...tom Position two Door Spacer Strips No 21 down each side of the Door No 22 Place the Hinges No 17 at the top and bottom of the door No 22 using 7x30mm black screws per hinge fix the hinge to the door...

Страница 12: ...eded Locate the Wooden Door Handle No 14 onto the outside of the door Fix in place by hand screwing through the door with the screw attached to the door handle On the inside of the door opening fix th...

Страница 13: ...20mm screw 14 15 1 2 Pre drill hole 15 14 A B A B AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back It is ESSENTIAL that you apply wood treatment immediately af...

Страница 14: ...2 1 3 4...

Страница 15: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: