background image

P 11

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Fix the 

casement stay

  to the 

opening window then align 

the fixings onto the window 

panel frame. Ensure the case-

ment stay fits into fixings when 

closed before screwing them 

down using 12 x 20mm screws. 

6x20mm screws per casement stay

28

Step 21

Step 20

 

To fix the lock in place. Screw the Staple 

to the Door Gable or Slave door.

Making sure the Hasp is in line with 

the staple  and screw into the Door or 

Master door.

To lock the Door, place the Hasp  over the 

Staple and twist into the lock position as 

shown.  

8x30mm screws. 

Pre drill 

hole

30mm 

screw

Содержание 01SHPWOR1610DDOW-V2

Страница 1: ...re treated with a water based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is E...

Страница 2: ...757mm Qty 11 19 Finial Qty 2 25 22 T Hinge Qty 6 Felt 26 casement stay QTY 2 Butt hinge QTY 4 Open Window Frame 28 24 29 23 Tower Bolt QTY 2 27 7 10 Door Qty 2 17 Door Gable Strip 2552mm Cover Strip 2...

Страница 3: ...m screws 5x40mm Screws 40mm screw Pre drill hole Plain Gable Assembly Step 3 12 x 50mm screws Lay the Back Left Gable and Back Right Gable on a level floor place them next to each other ensure they ar...

Страница 4: ...hole Step 4 Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and c...

Страница 5: ...ners with 50mm screws as shown in diagram 6x50mm Screws 50mm screw Pre drill hole Cut down trims to fit Measure the length of the door gable rail and cut down a strip match Fix in place using 2x30mm s...

Страница 6: ...83mm and one strip at 1445mm Place the smaller strip 1445mm centrally above the door aperture allowing a space of 10mm between the strip and the top of the door opening and fix into position using 3x3...

Страница 7: ...drill hole Place the fist two roof sheets ontop of the plain gable and truss making sure the roof sheet sits into the gables and truss securing using 40mm screws Ensure there is an eqal amount of over...

Страница 8: ...ill hole HANDLE WITH CARE 1 2 3 4 245 x felt tacks Cut four strips of felt and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram belo...

Страница 9: ...bles join using 4x40mm screws Pre drill to avoid splitting 28x40mm Screws 19 18 18 40mm screw Pre drill hole Cut down trims to fit 16x40mm Screws Fit the fascias to the roof over the felt and secure i...

Страница 10: ...shown in the diagram 6x30mm Screws 6x16mm Screws 4x30mm Screws Place the cover strip 11mm above the window gap in the window panel and fix with 3x30mm screws per strip Measure and trim before fitting...

Страница 11: ...window panel frame Ensure the case ment stay fits into fixings when closed before screwing them down using 12 x 20mm screws 6x20mm screws per casement stay 28 Step 21 Step 20 To fix the lock in place...

Страница 12: ...P 12...

Отзывы: