background image

P 1

01OVEABKSTR-V4

OVERLAP BIKE STORE

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

Refer to the instructions pages for your specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Pressure Treated Timber

Pressure treating is a chemical process which helps to protect wood against adverse weather which could 

lead to rot or insect damage.

The most common chemicals used to pressure treat wood are 

Alkaline Copper Quaternary

 (

ACQ

), 

Copper Azole

 (

CA

), and 

Micronized Copper Quaternary

 (

MCQ

).

Safety: 

Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in 

pressure treated wood, never burn its sawdust or scraps; instead dispose in a landfill.

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

Содержание 01OVEABKSTR-V4

Страница 1: ...uired to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treat ment to prevent water ingress Pressure Treated b...

Страница 2: ...loor Qty 2 AI 01OVEABKF795X990 V1 Fascia 7 x 60 x 1095mm Qty 4 OVLP760 1095MM Cover Trim 7 x 45 x 1324mm Qty 4 OVLP745 1324MM Eaves Frame 28 x 28 x 825mm Qty 2 F2828 825MM Ridge Bar 28 x 28 x 744mm Qt...

Страница 3: ...as where water can collect see front page for base requirements Position the floors side by side as shown in the diagram Fix together using 4 x 50mm screws alternating the fixing poisiton along the le...

Страница 4: ...per L Bracket 8 x 30mm Screws Pre drill hole 50mm screw 17 11 11 17 Step 6 IMPORTANT Pre drill before fixing screws Parts Needed No 5 Qty 2 No 10 Qty 2 Attach the Eaves Frame No 10 to the roof sheets...

Страница 5: ...gable and the fascia Use 3 x 30mm screws per fascia ensuring to fix through to the panel framing behind Attach the finial No 13 to the fascias at the fornt and the back of the building using 2 x 30mm...

Страница 6: ...screws 12 12 Step 12 Parts Needed No 16 Qty 4 Fix the turn buttons No 16 to the bolt blocks at the top and bottom of the door using a 30mm screw per turn button 2 x 30mm Screws 30mm screw Pre drill h...

Страница 7: ...5 to the front of the doors fixing the staple to the doors with the turn buttons and the hasp to the opposing door securing into place with 5x30mm screws 5x 30mm Screws 30mm screw Pre drill hole IMPOR...

Отзывы: