background image

P 8

Please retain product label and instructions for future reference

             

Step 14

Parts needed - No. 16 QTY 7

Fit the Cover Trims 

(No. 16)

 over each 

panel join and corner of the building 

as shown in the illustration using 30mm 

screws.  Pre drill to avoid splitting. 

21x30mm Screws

30mm 

screw

Pre drill 

hole

16

16

16

16

16

Step 15

Parts needed - No. 14 QTY 4

                                 No. 20 QTY 2

Fit the Fascias 

(No. 14)

 to the roof over 

the felt and secure in place with 40mm 

screws as shown.  Pre drill to avoid 

splitting.

Followed by adding the Finials 

(No. 20)

 

over the Fascias using x2 40mm screws 

per Finial.    

 

16x40mm Screws

40mm 

screw

Pre drill 

hole

14

14

20

20

14

14

Use 4x30mm Screws to fix 

each Door Beading Strip 

(No. 15)

 onto the insides of 

the Door Panel 

(No. 1) 

opening.  Ensure that the 

screw is parallel with the 

door frame when fixing the 

strip to the Door Panel as 

shown in the close up view.

8x30mm Screws

Attach the Inner Door Block 

(No.10) 

to the door 

(No.6)

 using 

2x30mm screws, in the positions 

illustrated. Screw through the 

door cladding into the blocks 

using 30mm screws 

2x30mm Screws

Step 16

Parts needed - No. 10 QTY 1

                                 No. 15 QTY 2  

30mm 

screw

30mm 

screw

Pre drill 

hole

Pre drill 

hole

15

15

a

b

a

b

10

Содержание 01DTSHRAX0806SDFW-V1

Страница 1: ...l be access to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer to diagrams for the base dimensions The base should...

Страница 2: ...180mm x2 S1240 1180mm Inner Window Strip 12x28x550mm x8 S1228 550mm Inner Door Block 28x28x150mm FS2828 150mm Cover Trims 12x40x1792mm x7 S1240 1792mm Ridge Bar 28x28x2304mm F2828 2304mm Finial Qty 2...

Страница 3: ...1 No 6 QTY 1 No 21 QTY 3 Place the door No 6 within the Door Panel No 1 Fix the T Hinges No 21 onto the door and Door Panel as shown taking into account on which side of the Door Panel opening you wa...

Страница 4: ...Screws 50mm screw Pre drill hole 5 4 Step 4 Parts needed No 2 or 1 or 4 QTY 1 No 4 or 1 or 2 QTY 1 Fix the corners of the Large Plain Side No 5 and a Window Panel No 2 or panel of your choice with 50...

Страница 5: ...Panel No 1 or panel of your choice to the already standing chosen panel and Small Plain Panel No 3 with 50mm screws as shown in diagram Do not secure the building to the floor until the roof has been...

Страница 6: ...o 17 below using 5x60mm screws per Roof Panel It is essential that the ridge bar No 17 and roof panel No 9 framing pull together when fixed with 60mm screws You may require another person pushing the...

Страница 7: ...ure there is an equal distance on all sides Attach 1x Outer Window Strip No 13 along the top of the window opening Followed by attaching 3x Outer Window Strips No 12 to either side of the windows and...

Страница 8: ...ollowed by adding the Finials No 20 over the Fascias using x2 40mm screws per Finial 16x40mm Screws 40mm screw Pre drill hole 14 14 20 20 14 14 Use 4x30mm Screws to fix each Door Beading Strip No 15 o...

Страница 9: ...24 QTY 1 Screw the Pad Bolt No 24 on to the door No 1 and the retainer to the door panel No 6 using 10x30mm screws Make sure that you screw into the framing behind 10x30mm Screws Pre drill hole 30mm...

Страница 10: ...2 1 3 4...

Страница 11: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: