Installation
Rev 1.2
Mellanox Technologies
26
2.5
Cable Installation
All cables can be inserted or removed with the unit powered on.
• To insert a cable, press the connector into the port receptacle until the connector is
firmly seated. The LED indicator, corresponding to each data port, will light when the
physical connection is established. When a logical connection is made the relevant port
LED will turn on.
• To remove a cable, disengage the locks and slowly pull the connector away from the
port receptacle. The LED indicator for that port will turn off when the cable is unseated.
For more information about port LEDs refer to Section 4.2.1.6, “Port LEDs,” on page 45.
Do not force the cable into the cage with more than 40 newtons / 9.0 pounds force /
4kg force. Greater insertion force may cause damage to the cable or the cage.
Figure 20: Cable Orientation
Содержание SB7700
Страница 25: ...Rev 1 2 Mellanox Technologies 25 Figure 19 Locking Mechanism...
Страница 60: ...Rev 1 2 Mellanox Technologies 60 5 6 7 8 9 10...
Страница 61: ...Rev 1 2 Mellanox Technologies 61 11 12 13 14 15 16...
Страница 62: ...Rev 1 2 Mellanox Technologies 62 17 18 19 20 21 WEEE 22...
Страница 64: ...Rev 1 2 Mellanox Technologies 64 7 8 9 10 InfiniBand 11 12 13 PSU InfiniBand...
Страница 77: ...Rev 1 2 Mellanox Technologies 77 4 5 45 C 113 F 8 3 6 7 8 9 10 InfiniBand InfiniBand...
Страница 78: ...Rev 1 2 Mellanox Technologies 78 11 12 13 14 15 16 UL CSA UL CSA 3 16 AWG 1 5 6 4 5 125 13 HAR 3 1 0 300 250 10...