background image

Mellanox Technologies Inc.         350 Oakmead Parkway, Sunnyvale, CA 94085            Tel: 408-970-3400           Fax: 408-970-3403          www.mellanox.com 

MTS3610  Installation Guide 

Document Number

 

3082

Rev 1.2.2

Package Contents

The package includes:

1  Chassis

1-18 leafs according to the amount ordered

18 - X leaf blanks X = the amount ordered

1 leaf fan module

1 spine fan module

9  spines

1- 2 management modules according to the amount ordered. If only 1 management module is ordered 
then one MM blank will be in the package.

6-8 power cables depending upon your specific order

6-8 PSUs depending upon your specific order

(8 - X) PSU blanks X = the amount ordered

RJ45 to DB9 cable

1 Installation kit

CD

Installation guide

Before you install your new MTS3610 Chassis, unpack the system and check to make sure that all the parts 
have been sent, check this against the parts list. Check the parts for visible damages that may have occurred 
during shipping. 

Note: If anything is damaged or missing, contact your customer representative immediately. 

Physical Installation

Warning: 

This equipment is very heavy. Safety is the first concern. The fully 

loaded chassis weighs ~350 lbs (155 kg). Make sure that proper manpower and 
equipment are used for transporting and moving the chassis. 

Note: You will need a mechanical lift, to move and insert the chassis into the rack. 

This chassis can be installed in 19” racks with a maximum depth of 81cm.

The switch platform uses 20U of rack space in a standard 19” rack. The switch ships from the factory with 
mounting racks on the front side. There are four threaded connectors on the top of the chassis for connecting 
eye bolts. The four eye bolts are included in the installation kit. The chassis can be lifted using these four eye 
bolts and a mechanical lift. The switch is supported from underneath the unit by a shelf. 

Choose a rack which is able to support the mechanical and environmental characteristics of a fully populated 
switch chassis as listed in the user manual.

Содержание MTS3610

Страница 1: ...may have occurred during shipping Note If anything is damaged or missing contact your customer representative immediately Physical Installation Warning This equipment is very heavy Safety is the first...

Страница 2: ...edure on the MTS3610 Switch system Step 1 Put an ESD prevention wrist strap on your wrist and make sure there is good contact between your body and the strap Step 2 Plug the other end of the wrist str...

Страница 3: ...e chassis as low as possible to keep the center of gravity low Choose which way you want the chassis to face in the rack Keep in mind that one side of the chassis can have up to 324 cables connected T...

Страница 4: ...as low as possible Step 2 Insert four caged nuts into the rack on the side you plan to have the connectors Note the U number on the rack Figure 4 Caged Nut Insertion Step 3 Screw the rail slides onto...

Страница 5: ...echanical lifting device Figure 7 Mechanical Lifting Device Step 3 Raise the chassis 2 cm 1 above the level of the shelf Step 4 Move the chassis over the shelf Place the chassis so that the face plate...

Страница 6: ...en all ten bolts and nuts Step 10 Place the lock down bar over the lip of the chassis and align the holes in the lock down bar with the holes in the shelf Figure 9 Lock Down Bar Step 11 Place a washer...

Страница 7: ...not rely on the PSU grounds It is absolutely necessary to connect the grounding post Make sure the connections are solid and permanent Figure 10 Ground Connection Installing the Cable Holder Holes fo...

Страница 8: ...the remaining power supply units Note A fully loaded MTS3610 switch system can draw 5 2 kW of power Make sure that the outlets and circuits will not be overloaded Spread out the load over at least two...

Страница 9: ...or the First Time Step 1 Connect the host PC to the RS 232 port of the MTS3610 switch using the supplied cable This LED should be off This LED should be on The green connector LEDs should be on The ye...

Страница 10: ...omments Do you want to use the wizard for initial configuration You must perform this configuration the first time you operate the switch or after resetting the switch to the factory defaults Type y a...

Страница 11: ...RX mcast packets 0 RX discards 0 RX errors 0 RX overruns 0 RX frame 0 TX bytes 122850 TX packets 1119 TX discards 0 TX errors 0 TX overruns 0 TX carrier 0 You have entered the following information 1...

Страница 12: ...the Switch for the First Time section Step 4 You can enter any supported command now Note For a complete reference of commands please see Mellanox FabricIT Management Software User s Manual Starting...

Отзывы: