Mellanox Technologies MSX6536-10R Скачать руководство пользователя страница 1

www.mellanox.com

648-Port InfiniBand FDR SwitchX®

Switch Platform Hardware Installation Guide

PN:MSX6536-10R,MSX6536-NR

 

Rev 1.

5

Содержание MSX6536-10R

Страница 1: ...www mellanox com 648 Port InfiniBand FDR SwitchX Switch Platform Hardware Installation Guide PN MSX6536 10R MSX6536 NR Rev 1 5...

Страница 2: ...Document Number 3504 Mellanox Technologies 2...

Страница 3: ...ections 37 1 8 1 Powering Up the Switch Platform 38 1 9 InfiniBand QSFP Cable Installation 39 1 9 1 Supported Approved Cables 40 1 9 2 Cable Power Classes 40 1 10 Hot Swap Insertion and Extraction 40...

Страница 4: ...ply Unit 80 6 2 Leaf Board 80 6 3 Management Module 81 6 4 Spine Board 82 6 5 MLNX OS Software 82 Chapter 7 Disassembly and Disposal 84 7 1 Disassembling the Chassis 84 7 1 1 Removing the Chassis 86 7...

Страница 5: ...us 63 Table 9 Bad Port LED Configurations 63 Table 10 LEDs Display for Normal Operation 64 Table 11 LEDs Display for Normal Operation 65 Table 12 Management Module PSU LED Configurations 65 Table 13 M...

Страница 6: ...he Upper Bracket Offset 29 Figure 15 Attach the Shelf Extension 29 Figure 16 Place Caged Nuts 30 Figure 17 Location for the Lock Down Bar 30 Figure 18 Fork Lift 30 Figure 19 Mechanical Lift 31 Figure...

Страница 7: ...Signal Connectors 55 Figure 53 Intact vs Defected Power Pin Holders 56 Figure 54 Power Supply Unit Status Indications 58 Figure 55 PSU Cover On and Off 59 Figure 56 Leaf Board Led Indicators 59 Figur...

Страница 8: ...ted Chapter 1 Overview on page 12 and re ordered sections Added Figure 60 Management Module LEDs on page 65 Updated Section 1 4 Power Supply Redundancy on page 15 Section 1 7 3 5 Installing the Shelf...

Страница 9: ...Architecture Specification that is provided by IBTA Switch Product Release Notes For possible hardware issues see the switch support product page This requires a customer support login Look up the re...

Страница 10: ...Mellanox Technologies SX System Type SwitchX Switch PR Data Transfer Protocol 1 2 3 4 Ethernet 5 6 7 8 InfiniBand G Module Generation 5 6 7 8 FF Number of leafs 36 18 12 06 C Data Rate B 40Gb s Ethern...

Страница 11: ...ions to make the initial configuration 1 1 Installation Safety Warnings These safety warnings are in English For French German Spanish Russian and Roma nian see the Appendixes 1 Installation Instructi...

Страница 12: ...with an ambient temperature exceed ing the maximum recommended 45 C 113 F Moreover to guarantee proper air flow allow at least 8cm 3 inches of clearance around the ventilation openings The chassis sh...

Страница 13: ...cial warnings instructions When this product is mounted or serviced in a rack special precautions must be taken to ensure that the system remains stable In general you should fill the rack with equip...

Страница 14: ...rth terminal screws of this device must be connected to the protective earth in the building installation GND Connection Information The building installation shall provide a means for a connection to...

Страница 15: ...ical mechanical and fire enclosure shall be provided by the end prod uct manufacturer and or the end user Caution Slide rail mounted equipment is not to be used as a shelf or a work space The rails ar...

Страница 16: ...y have occurred during shipping It is highly recommended that the installation sites be as isolated as possible from all sources of radio transmissions and electrical interference It is highly recomme...

Страница 17: ...t of the switch is supported from underneath the unit by the shelf This chassis can be installed in standard 19 racks that have between 65cm and 80cm between the vertical supports of the rack Make sur...

Страница 18: ...not hit the door 1 7 2 ESD Connection Before starting any procedure on the SX6536 switch system 1 Put an ESD prevention wrist strap on your wrist and make sure there is good contact between your body...

Страница 19: ...poses It is recommended to have at least two people for the duration of the installation proce dure Use a mechanical lift to raise this chassis If not use enough manpower to ensure the safety and well...

Страница 20: ...ilt stickers have tripped 32 lock washers 20 for the lock down bars and 12 for the upper brackets to upper bracket offsets 12 flat head screws for the upper bracket offsets 2 upper brackets 1 socket n...

Страница 21: ...ck and Tilt Stickers HANDLE WITH CARE HANDLE WITH CARE G G I I N N N N R R W WA A G G I I N N N N R R W WA A HANDLE WITH CARE HANDLE WITH CARE G G I I N N N N R R W WA A G G I I N N N N R R W WA A TIL...

Страница 22: ...by unscrewing the phillips head screws hold ing the sides on 3 Remove and put aside the box 4 Visually inspect the chassis make sure that there is no visible damage 10 PSUs are installed for the chas...

Страница 23: ...bars at this time The chassis is on ball bearings and can roll easily Be aware that the chassis can roll off of the pallet Should the chassis start to fall move out of the way The chassis can cause gr...

Страница 24: ...d should plan to keep the spine side as close to the rack door as possible thus having more room for the cables 4 Measure the distance between the vertical supports and adjust the shelf brackets accor...

Страница 25: ...he shelf Place the shelf bracket so that it measures slightly more than the measured distance between the vertical rack supports Make sure that there is enough play in the bracket so that it can move...

Страница 26: ...o not use the top hole in the bracket 8 Insert 4 caged nuts two on right and 2 on the left of the spine side for the bottom filler panel 9 Put the Shelf into the rack and twist the shelf into place Ma...

Страница 27: ...port at the locations corresponding to the holes in the chassis faceplate The holes in the faceplate start at 2U above the shelf and are spaced every 4U centered as you go up the vertical rack support...

Страница 28: ...Using a Fork Lift Figure 13 Putting the Chassis in the Rack Using a Mechanical Lift The chassis is on ball bearings and can roll easily Be aware that the chassis can roll off of the pallet Should the...

Страница 29: ...ardware User Manual Rev 1 7 Mellanox Technologies 29 Figure 14 Place the Upper Bracket Offset 2 Screw on the two Upper Bracket offsets onto the chassis using six flat head screws for each offset Figur...

Страница 30: ...rack in the vertical supports Figure 17 Location for the Lock Down Bar 5 Unscrew both lock down bars 6 Place the chassis in front of the rack and as close as possible to the rack Figure 18 Fork Lift...

Страница 31: ...at it is 5cm above the shelf in the rack 8 Raise the hinged extension on the container floor 9 Lower the chassis until the hinged extension is sitting on the shelf extension 10 Push the chassis from t...

Страница 32: ...tion of the upper brackets on the vertical supports on the connector side of the chassis 12 Confirm that the caged nuts for the faceplate are in the correct location 13 Slide the chassis out just far...

Страница 33: ...need the socket wrench with both extensions to tighten these bolts 15 Slide the chassis onto the shelf until the face plate of the chassis touches the vertical rack support 16 Make sure the upper bra...

Страница 34: ...r the Lock Down Bar Figure 25 Lock Down Bar 19 Place the front lock down bar at the edge of the chassis and align the holes in the lock down bar with the holes in the shelf Screw down the lock down ba...

Страница 35: ...ge 32 24 Tighten the upper bracket to upper bracket offset screws See Figure 23 25 Tighten the lock down bars See Figure 26 26 Connect the bottom filler panel below the shelf bend facing out 27 Connec...

Страница 36: ...ogies 36 1 7 4 Installing the Cable Holder Figure 28 Cable Holder Now is the time to install the cable holder Left side rack Top side 16 X M6 caged nut 16 X M6 bolt for caged nut Cable support shelf F...

Страница 37: ...wire of AWG 6 or 4mm diameter is recommended for grounding this device The chassis is concurrently grounded through each of the PSUs Only connect the PSU cords to properly grounded outlets Do not rel...

Страница 38: ...boot com mand in the CLI or reboot through the Web GUI The power system will divide the current consumption by the number of working PSUs Should one of the PSUs fail the total current consumption will...

Страница 39: ...FP connectors in two rows which are numbered 1 18 See Section 2 1 6 for port numbering Any yellow or red status LEDs on any of the management modules is cause for con cern and must be dealt with immed...

Страница 40: ...es The Mellanox SX65xx series chassis are rated for cables up to class 2 as per the SFF committee classification SFF 8436 PDF See http www mellanox com content pages php pg cables for the cable class...

Страница 41: ...ed to run the switch system is equally divided between all of the work ing PSUs 1 10 1 1 Extracting and Inserting the Power Supply Unit With all of the 1000W power supplies installed the system is in...

Страница 42: ...ews for the cover plate Figure 34 Power Supply 4 Grasping the handle with one hand push the black latch release while pulling the handle outward As the PSU unseats the PSU status indicators will turn...

Страница 43: ...s should light If not extract the PSU and re insert it again Do NOT mix replacement parts based on different generations of chip Do not install InfiniScale IV based replacement parts within a SwitchX...

Страница 44: ...ating or extracting see Figure 36 1 Run the shut down command no power enable module For example to shut down leaf 16 run the command below 2 Disconnect all cables connected to the leaf 3 Push the eje...

Страница 45: ...ceable damage 3 Check back signal connectors integrity Look for any broken signal dividers or any deviations from the pass criterion shown in Figure 38 Figure 38 Intact vs Defected Signal Connectors T...

Страница 46: ...es to the front panel of the leaf 6 Holding the leaf by its sides carefully set the leaf board into the chassis 7 Applying equal pressure on both sides of the leaf board slowly slide the board into th...

Страница 47: ...e IV based replacement parts within a SwitchX based chas sis and vice versa All Replacement modules must be consistent with the Chassis fam ily and switch chip generation When hot swapping any of the...

Страница 48: ...rd on the ejector handles to unlock the ejectors from the chassis Removing spine 1 causes management module 1 to reset Removing spine 2 causes management module 2 to reset Warning If the spine you wan...

Страница 49: ...sert a spine board 1 Check for foreign objects in or mechanical damage to the chassis spine slots 2 Check spine mechanics for any noticeable damage or deviations from the pass crite rion shown in Figu...

Страница 50: ...ss criteria shown in Figure 43 and Figure 44 Figure 43 Intact vs Defected Side Signal Connectors Figure 44 Intact vs Defected Middle Signal Connectors 4 Check power connector s integrity Look for any...

Страница 51: ...f the chassis four on the leaf side corners and four on the spine side corners When a fan module is not functioning the status LED on the fan will light up Each spine has an individual fan module that...

Страница 52: ...s are found on the spine side The leaf side fans are not interchangeable with the spine side fans Air flow through the leafs is independent of the air flow through the spines Figure 47 Leaf Fan Locati...

Страница 53: ...e will light up Figure 49 Spine Fan Module When a fan module is removed the indicator light will reset Figure 50 Fan Status LED on the Spine Module Extracting the Spine Fan Module 1 Push the two blue...

Страница 54: ...ected to the management module 3 Push outward on the ejector handles to unlock the ejectors from the chassis 4 Open the ejectors until they are 45 degrees from the module 5 Pull out the module half wa...

Страница 55: ...ders or any deviations from the pass criterion shown in Figure 52 Figure 52 Intact vs Defected Signal Connectors 4 Check power connector s integrity Look for any damage on the power connector casing o...

Страница 56: ...d 1 10 6 Switch Shut Down Procedures To shut down the chassis run the following command twice once for each MM Do not apply excessive force to slide in the management board If you feel resistance remo...

Страница 57: ...shut down a leaf run the following command To shut down a spine run the following command To shut down a management module run the following command The chassis cannot be restarted remotely To restart...

Страница 58: ...it has the following indicator LEDs Figure 54 Power Supply Unit Status Indications AC When lit this LED indicates input voltage between 100 and 240 Volts DC FAIL When lit this LED indicates a fault in...

Страница 59: ...cators 2 1 2 1 Status LED Each leaf board has a Status LED on the far left of the leaf Table 3 shows the leaf status according to the LED condition S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S...

Страница 60: ...tact Mellanox Technologies support 2 1 2 4 Leaf Board Port Connector LED Assignment Above the ports are two LEDs one for the upper port and one for the lower port Each port has a single 2 color LED Ta...

Страница 61: ...ndividual spine The 36 LEDs on each spine are divided by the number of leafs and the result N is the number of connections from each leaf that are connected to the spine 18 spines must be installed an...

Страница 62: ...shing Green Spine is powering up Solid Orange Non fatal error this spine needs troubleshooting but does not require chassis shutdown Solid Red Fatal error Table 7 Spine Fan Status LED LED Color LED De...

Страница 63: ...nnector This LED lights up when one or more ports is receiving a symbol error The LED imme diately goes off until the next symbol error is received 2 1 3 5 UID LED Switch Identifier The UID LED is a d...

Страница 64: ...operational Red PS fault detected User should check individual power supplies for fault indications Green SPINE FANS STATUS Off No power to fan Green Nominal operational Red One or more of the spine f...

Страница 65: ...PS fault detected User should check individual power supplies for fault indications Green SPINE FANS STATUS Off No power to fan Green Nominal operational Red One or more of the spine fans is bad User...

Страница 66: ...ed from the top row See Figure 62 Figure 61 Port Numbering Figure 62 Top and Bottom Ports Table 13 Management Module S Fan LED Configurations LED Condition Description Green OK All Spine fans are work...

Страница 67: ...to the SX6536 They are 1 I2C port 1 CONSOLE port this is an RS232 connector for connecting to a host machine 1 MGT this is an Ethernet connector 1 USB port 1 RST reset button Figure 63 Management Modu...

Страница 68: ...n the master management module this management module is reset becoming the slave and the other management module becomes the master If there is only one management module in the chassis all of the le...

Страница 69: ...re connected to a second power grid 1 Check all FRUs for proper insertion and seating before connecting the AC power cords Boards Power supplies Leaf fan modules Spine fan modules 2 Insert all leafs t...

Страница 70: ...icates power supplies are good 3 Spine Board indicators will display status of internal links to the installed leaf boards All PHY links to existing leaf Boards should be ON 4 Check the Spine LEDs and...

Страница 71: ...xamples Figure 67 Console Ports for SX60xx SX65xx Managed Systems On SX65xx systems when having dual management systems first connect the cable and configure the master card and only then configure th...

Страница 72: ...esetting the switch to the factory defaults Type y and then press Enter Step1 Hostname switch 1 If you wish to accept the default hostname then press Enter Otherwise type a different hostname and pres...

Страница 73: ...se DHCP on mgmt0 interface yes 3 Enable IPv6 yes 4 Enable IPv6 autoconfig SLAAC on mgmt0 interface yes 5 Admin password Enter to leave unchanged CHANGED To change an answer enter the step number to re...

Страница 74: ...Enable IPv6 autoconfig SLAAC on mgmt0 interface no no Step 9 Admin password Enter to leave unchanged You have entered the following information 1 Hostname switch 112126 2 Use DHCP on mgmt0 interface...

Страница 75: ...name Step 9 Enable IPv6 yes yes Step 10 Enable IPv6 autoconfig SLAAC on mgmt0 interface no no Step 11 Admin password Enter to leave unchanged You have entered the following information 1 Hostname swi...

Страница 76: ...tch default username is admin password admin Step 4 Read and accept the EULA when prompted switch show interfaces mgmt0 Interface mgmt0 state Admin up yes Link up yes IP address 169 254 15 134 Netmask...

Страница 77: ...Internet Explorer 7 0 Chrome or Mozilla Firefox 3 0 Note Make sure the screen resolution is set to 1024x768 or higher Step 3 Type in the IP address of the switch or its DNS name in the format http sw...

Страница 78: ...hnologies 78 Step 5 Read and accept the EULA if prompted You are only prompted if you have not accessed the switch via CLI before Figure 69 EULA Prompt After login a default status summary window is d...

Страница 79: ...e this management module is reset becoming the slave and the other management module becomes the mas ter If there is only one management module in the chassis when the reset button is pushed all of th...

Страница 80: ...DC OK 2 Uninstall and reinstall the Leaf board 3 When the Yellow LED is on this indicates a fault in the board uninstall and reinstall the Leaf board 4 If uninstalling and reinstalling the Leaf board...

Страница 81: ...Issue 2 Yellow LED for the Leaf Fan on the Management Module is Lit 1 Check the MLNX OS management for confirmation and possible explanation of the alert 2 Make sure that there is nothing blocking th...

Страница 82: ...irmation and possible explanation of the alert 2 Make sure that there is nothing blocking the front or rear of the chassis and that the fan modules and ventilation holes are not blocked especially dus...

Страница 83: ...MHz Security Kasumi support Bootstrap Option H Boot ROM Location I2C Addr 0x52 Internal PCI arbiter disabled 32 kB I Cache 32 kB D Cache Board Mellanox PPC460EX Board FDEF No I2C ready DRAM 2 GB ECC...

Страница 84: ...e for detailed instructions for disassembly of the FRUs and chassis according to the WEEE Directive 10 Using a socket wrench remove the hex head screws holding down the lock down bar on the spine side...

Страница 85: ...Mellanox Technologies 85 Figure 72 Lock down Bar 11 Remove the lock down bar 12 Dispose of these pieces in a legal and environmentally friendly way These holes are to screw the bar into the shelf The...

Страница 86: ...l Mellanox Technologies 86 Figure 73 Face Plate Mounting Bolt Locations 7 1 1 Removing the Chassis 1 Remove the screws connecting the upper brackets to the rack Holes in the faceplate for mount ing on...

Страница 87: ...iner base to 1 cm below the level of the shelf 7 Move the chassis away from the rack and onto the container base 8 Put wedges around the chassis to prevent the chassis from rolling off of the containe...

Страница 88: ...nstructions for disassembly according to the WEEE Directive According to the WEEE Directive 2002 96 EC all waste electrical and electronic equipment EEE should be collected separately and not disposed...

Страница 89: ...equipment is very heavy and should be moved using a mechanical lift to avoid injuries This unit is intended for installation in a Restricted Access Location Risk of Electric Shock With the fan module...

Страница 90: ...duct or touching any internal parts Risk of electric shock and energy hazard The PSUs are all independent Disconnect all power supplies to ensure a powered down state inside of the switch platform Dur...

Страница 91: ...ical Code and the Canadian Electrical Code Warning Replace only with UL Recognized battery certified for maximum abnormal charging current not less than 4mA There is a risk of explosion should the bat...

Страница 92: ...ommunication centre or a dedicated computer room This device must be installed according to the latest version of the country national electrical codes For North America equipment must be installed in...

Страница 93: ...all waste electrical and electronic equipment EEE should be collected separately and not disposed of with regular household waste Dispose of this product and all of its parts in a responsible and env...

Страница 94: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 94 5 6 7 8 9 10 11 45 C 113 F 8 3 PSU...

Страница 95: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 95 12 InfiniBand 13 14 15 16 17 18 InfiniBand UL 4mA...

Страница 96: ...User Manual Mellanox Technologies 96 19 UL CSA 20 21 GND 22 23 24 25 UL CSA 16 AWG 125 V 13 A 1 5 4 5 HAR 1 0 300 V PVC 250 V 10 A GND RS232 UL DP 1 DP 2 LPS 20 A CLASS 1 IEC 60 825 1 1993 A1 1997 A2...

Страница 97: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 97 26 27 WEEE 28 WEEE 2002 96 EC EEE TN IT...

Страница 98: ...nual Mellanox Technologies 98 29 China CCC Warning Statement A 3 Avertissements de s curit pour l installation French 1 Instructions d installation Veuillez lire la totalit des instructions d installa...

Страница 99: ...odule de ventilation est retir les broches d alimentation sont expos es dans l emplacement du module NE PAS ins rer d outils ou la main dans l emplacement du module Cet quipement ne doit pas tre en se...

Страница 100: ...ors tension d branchez toutes les alimen tations Pendant un orage ne pas travailler sur l quipement ni brancher ou d brancher des c bles Les c bles InfiniBand en cuivre sont lourds et peu flexibles Pa...

Страница 101: ...16 AWG avec une prise moul e 125 V 13 A faisant au moins 1 5 m de long six pieds et au plus 4 5 m Pour le branchement lectrique en Europe utiliser un cordon d alimentation au format international har...

Страница 102: ...e Attention l utilisation de commandes l ajustement ou la conduite de proc dures autres que celles indiqu es ici pourraient conduire une exposition dangereuse des rayonnements Pour les produits dispos...

Страница 103: ...erletzungen zu vermeiden Diese Ger t ist f r die Installation in einem Bereich mit beschr nktem Zugang vorge sehen Stromschlagrisiko Bei abgenommenem Ventilatormodul sind die Stromkontakte in der Modu...

Страница 104: ...teile Risiko eines Stromschlags und Stomgefahr Alle Stromversorgungseinheiten sind unabh ngig Trennen Sie alle Stomversorgungen um einen abgeschalteten Zustand im Inneren der Switch Plattform sicherzu...

Страница 105: ...L anerkannten Akkus ersetzen die f r maximalen anor malen Ladestrom von nicht weniger als 4mA zertifiziert sind Es besteht Explosiionsgefahr wenn der Akku durch einen Akku eines falschen Typs ersetzt...

Страница 106: ...de Verkabelung Achtung Nutzung von Steuerungen oder Einstellungen oder Ausf hrung von Proze duren die hier nicht spezifiziert sind kann zu gef hrlichem Strahlenkontakt f hren Klasse 1 Laserprodukt und...

Страница 107: ...over nicamente mediante un elevador mec nico para evitar lesiones Esta unidad ha sido ideada para instalar en lugares de acceso restringido Riesgo de descarga el ctrica Con el m dulo del ventilador qu...

Страница 108: ...l neutro Quitar los cables de corriente antes de abrir la tapa de este producto o tocar cualquier componente interno Riesgo de descarga el ctrica y peligro de corriente Todas las fuentes de alimentaci...

Страница 109: ...ciones vigentes del C digo El ctrico Nacional de los EE UU y del C digo El ctrico de Canad II y a danger d explosion s il y a remplacement incorrect de la batterie Remplacer uniquement avec une batter...

Страница 110: ...ificio El equipo se instalar en un rea donde haya conexi n equipotencial como por ejemplo un centro de telecomunicaciones o una sala de computadoras dedicada Este dispositivo se debe instalar conforme...

Страница 111: ...a unidad hacia afuera del bastidor Sirven solo para la instalaci n permanente en el lugar de destino final no para fines de servicio o mantenimiento Conforme a la Directiva 2002 96 CE sobre RAEE todos...

Страница 112: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 112 4 5 6 7 8 9 10 45 C 113 F 8 3...

Страница 113: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 113 11 12 InfiniBand 13 14 15 16 17 InfiniBand...

Страница 114: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 114 18 19 UL CSA 20 21 22 UL 4 UL CSA 3 16 AWG 1 5 6 4 5 125 13 HAR 3 1 0 300 250 10...

Страница 115: ...24 25 26 27 WEEE A 7 Avertismente privind siguran a la instalare Romanian 1 Instruc iuni de instalare RS232 Ethernet DP 1 DP 2 UL 20 1 IEC 60 825 1 1993 A1 1997 A2 2001 EN 60825 1 1994 A1 1996 A2 2001...

Страница 116: ...ndep rtat pinii electrici sunt accesibili n cavitatea modulului NU introduce i instrumente sau p r i din corp n cavitatea modulului ventilator Acest echipament nu trebuie s fie ac ionat ntr o zon und...

Страница 117: ...ele de alimentare cu energie pentru a asigura decuplarea n inte riorul platformei de comutare n timpul perioadelor cu desc rc ri electrice luminoase nu lucra i cu echipamentul sau nu conecta i sau dec...

Страница 118: ...4 5 m Pentru conectarea la o surs de alimentare n Europa selecta i un cordon de alimentare care este armonizat la nivel interna ional i marcat HAR cu 3 conductoare cu minimum 2 fire de 1 0 mm cu pute...

Страница 119: ...20 A trebuie s fie integrat n cablajul cl dirii Aten ie Utilizarea elementelor de comand sau ajustarea sau executarea altor proce duri dec t a celor indicate n acest document poate avea ca rezultat e...

Страница 120: ...je vrlo te ka i treba se premje tati pomo u mehani kog dizala kako bi se izbjegle ozljede Ovaj ure aj je namijenjen za instaliranje na lokaciju s ograni enim pristupom Rizik od strujnog udara S uklon...

Страница 121: ...li ako nije dobro pri vr en Ovaj sustav raspola e dvopolnim neutralnim osigura ima Uklonite sve kabele napa janja prije otvaranja poklopca proizvoda ili dodirivanja unutarnjih dijelova Rizik od strujn...

Страница 122: ...ma navedenim u US National Electrical Code i Canadian Electrical Code Upozorenje Bateriju zamijenite samo baterijom iz serije UL koja je certifici rana za maksimalnu nepravilnu struju punjenja ne manj...

Страница 123: ...ure aj mora instalirati sukladno najnovijoj verziji nacionalnih elektri nih kodova dr ave U Sjevernoj Americi oprema se mora instalirati sukladno va e im zahtjevima navedenim u US National Electrical...

Страница 124: ...002 96 EZ sav elektri ni i elektroni ki otpad EEE trebao bi se prikupljati zasebno i ne bi se trebao odlagati kao obi an ku anski otpad Odlaganje ovog proizvoda i svih njegovih dijelova vr ite na odgo...

Страница 125: ...mail info mellanox com Map and Directions Tech Support 408 916 0055 8 00AM to 5 00 PM Pacfic Mellanox Technologies Ltd Beit Mellanox PO Box 586 Yokneam 20692 Israel Tel 972 0 4 909 7200 972 0 74 723 7...

Страница 126: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 126 648 Port InfiniBand FDR Switch Platform Installation Guide...

Отзывы: