
MAINTENANCE
6-1
MA-5130-GBR
PS20 NON STOP DRUM UNLOADER INHIBITION MANUAL
6. MAINTENANCE
Warning
: The melter equipment is equipped with current technology, but
has certain foreseeable risks. Therefore, only allow qualified personnel with
enough training and experience to operate install or repair this equipment.
The following table briefly summarizes the indications for adequate melter
equipment maintenance. Always read the corresponding section carefully.
If the equipment does not work or works incorrectly, called to your Meler
Representative or to the Main Office.
Equipment cleaning
To continue to take advantage of the melter’s benefits and to ensure the
perfect mobility of its components, it is necessary to keep all its parts clean,
especially the ventilation grate on the upper part of the machine.
Warning:
Risk of electric shock. Carelessness may result in injury or death.
Clean the exterior using a cloth moistened with water. Do not use flammable
liquids or solvents.
To carry out external cleaning:
• Use cleaning products compatible with polyamide materials.
• Apply the cleaning product with a soft cloth.
• Do not use sharp tools or scrapers with sharp edges.
Operation
Frecuency
Refer to
External cleaning
Daily
Equipment cleaning
System depressurization
Before performing maintenance tasks and repai-
ring the hydraulic system
Depressurizing the system
Emptying and cleaning the tank - When burnt adhesive is present
- With each adhesive change
Cleaning the tank
Check for pump leaks
Depending on the hours of operation and the
temperature and speed parameters (min. once
per month)
Pump maintenance
Check the lubrication (motor
and gear)
Depending on the temperature and conditions of
use (max. 8000 hours)
Motor-gear maintenance
Air dryer filters
- Purge water condensation (weekly)
- Clean the filter (at least twice a year)
Air filter maintenance
Содержание PS20
Страница 1: ...GLUING SOLUTIONS MA 5130 GBR 221220 ADHESIVE MELTER PS20 NON STOP INHIBITION INSTRUCTIONS MANUAL ...
Страница 15: ...INTRODUCTION 2 5 MA 5130 GBR PS20 NON STOP DRUM UNLOADER INHIBITION MANUAL 10 11 9 12 7 8 1 2 3 6 4 13 5 5 ...
Страница 18: ...FOCKE MELER GLUING SOLUTIONS 2 8 INTRODUCTION This page is intentionally left blank ...
Страница 30: ...FOCKE MELER GLUING SOLUTIONS INSTALLATION 3 12 This page is intentionally left blank ...
Страница 56: ...FOCKE MELER GLUING SOLUTIONS 4 26 NAVEGATION SUR L ECRAN TACTILE Cette page n a pas de texte ...
Страница 80: ...FOCKE MELER GLUING SOLUTIONS 7 4 TECHNICAL CHARACTERISTICS This page is intentionally left blank ...
Страница 81: ...ELECTRICAL DRAWINGS 8 1 MA 5130 GBR PS20 NON STOP DRUM UNLOADER INHIBITION MANUAL 8 ELECTRICAL DRAWINGS ...
Страница 82: ...FOCKE MELER GLUING SOLUTIONS 8 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Страница 84: ...FOCKE MELER GLUING SOLUTIONS 9 2 PNEUMATIC DRAWING 1 2 3 4 9 8 5 6 7 16 17 19 18 10 11 12 13 14 15 ...
Страница 86: ...FOCKE MELER GLUING SOLUTIONS 9 4 PNEUMATIC DRAWING This page is intentionally left blank ...
Страница 88: ...FOCKE MELER GLUING SOLUTIONS 10 2 SPARE PARTS LIST This page is intentionally left blank ...
Страница 96: ...FOCKE MELER GLUING SOLUTIONS 10 10 SPARE PARTS LIST 3 27 1 2 21 6 10 9 4 7 5 20 22 ...